H. PREPARATION FOR OPERATION/START-UP

The following items should be checked before attempting to operate the dryer:

1.Read ALLCAUTION,” “WARNING,” and “DIRECTION” labels attached to the dryer.

2.Check incoming supply voltage to be sure that it is the same as indicated on the dryer data label affixed to the upper left side panel area behind the top control (access) door. In the case of 208 VAC or 240 VAC, the supply voltage must match the electric service specifications of the data exactly.

3.GAS MODELS - Check to assure that the dryer is connected to the type of heat/gas indicated on the dryer data label.

4.GAS MODELS - The sail switch damper assembly was installed and adjusted at the factory prior to shipping. However, each sail switch adjustment must be checked to assure that this important safety control is functioning. (Refer to sail switch adjustment on page 31.)

5.Check bolts, nuts, screws, terminals, and fittings for tightness and security.

6.GAS MODELS - Be sure that ALL gas shutoff valves are in the open position.

7.Check ALL back guard panels and service box covers have been replaced.

8.Check the lint drawer to assure that it is closed and secured in place.

9.Rotate the basket (tumbler/drum) by hand to be sure it moves freely.

10.Check basket (tumbler) bearing setscrews to insure that they are ALL tight.

11.Check vent is connected to the dryer and is exhausted to the outdoors.

12.There should be a source of fresh air entering the room. This source should not be near where the dryers exhaust to the outside.

29

Image 33
Contents MDG75V Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Receiving and Handling Important InformationWhat to do if YOU Smell GAS Safety PrecautionsPage Specifications SpecificationsMDG75V Component Identification Page Location Requirements Installation ProceduresUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Requirements General Exhaust Ductwork Information Exhaust RequirementsPage Page Multiple common Dryer Venting Importantventingreminders Electrical Requirements Electrical InformationMust be Provided SINGLE-PHASE 1Ø Electrical Connections Leads Important a Circuit Servicing Each Dryer Must be Provided Page MDG75V GAS GAS Information Type of GAS Page Page Preparation for OPERATION/START-UP GAS Models only Preoperational TestsBasket Tumbler Coating Shutdown Instructions Preoperational InstructionsSERVICE/PARTS Information ServiceParts Routine Maintenance CleaningSuggested Cleaning Schedule Lubrication AdjustmentsLint Drawer Removal Microprocessor Controller Computer Models TroubleshootingBlower motor is not operating does not start Microprocessor controller computer display reads dSFL GAS Models only Dryer operates but is taking too long to dry Dryer is making scraping noise at basket tumbler area Data Label Data Label InformationSerial Number Sectionviii Procedure for Functional Check Replacement ComponentsPage 113160 1 11/27/02-25