American Dryer Corp MDG75V installation manual Must be Provided

Page 24

NOTE: Component failure due to improper voltage application will VOID THE WARRANTY.

3.Grounding

A ground (earth) connection must be provided and installed in accordance with state and local codes. In the absence of these codes, grounding must conform to applicable requirements of the National Electrical Code ANSI/NFPA NO. 70-LATEST EDITION, or in Canada, the installation must conform to applicable Canada Standards: Canadian Electrical Codes Parts 1 & 2 CSA C22.1-1990 or LATEST EDITION. The ground connection may be to a proven earth ground at the location service panel.

For added personal safety, when possible, it is suggested that a separate ground wire (no. 18 minimum) be connected from the ground connection of the dryer to a grounded cold water pipe. DO NOT ground to a gas pipe or hot water pipe. The grounded cold water pipe must have metal to metal connection ALL the way to the electrical ground. If there are any nonmetallic interruptions, such as, a meter, pump, plastic, rubber, or other insulating connectors, they must be jumped out with no. 4 copper wire and securely clamped to bare metal at both ends.

IMPORTANT: For personal safety and proper operation, the dryer must be grounded.

Provisions are made for ground connection in each dryer at the electrical service connection area.

4.Electrical Connections

A wiring diagram is located inside the control box for connection data.

a. Gas Models

NOTE: A CIRCUIT SERVICING EACH DRYER

MUST BE PROVIDED.

1)Single-Phase (1ø) Wiring Connections/Hookup

The electrical input connections on ALL single-phase (1ø) gas dryers are made into the rear service box located at the upper left area of the dryer.

20

Image 24
Contents MDG75V Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Important Information Receiving and HandlingSafety Precautions What to do if YOU Smell GASPage Specifications SpecificationsMDG75V Component Identification Page Installation Procedures Location RequirementsUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements General Exhaust Ductwork InformationPage Page Multiple common Dryer Venting Importantventingreminders Electrical Information Electrical RequirementsMust be Provided SINGLE-PHASE 1Ø Electrical Connections Leads Important a Circuit Servicing Each Dryer Must be Provided Page MDG75V GAS GAS Information Type of GAS Page Page Preparation for OPERATION/START-UP Preoperational Tests GAS Models onlyBasket Tumbler Coating Preoperational Instructions Shutdown InstructionsSERVICE/PARTS Information ServiceParts Routine Maintenance CleaningSuggested Cleaning Schedule Adjustments LubricationLint Drawer Removal Troubleshooting Microprocessor Controller Computer ModelsBlower motor is not operating does not start Microprocessor controller computer display reads dSFL GAS Models only Dryer operates but is taking too long to dry Dryer is making scraping noise at basket tumbler area Data Label Information Data LabelSerial Number Procedure for Functional Check Replacement Components SectionviiiPage 113160 1 11/27/02-25