American Dryer Corp MDG75V installation manual

Page 31

3.Piping Connections

ALL components/materials must conform to National Fuel Gas Code Specifications ANSI Z223.1-LATEST EDITION, or in Canada, CAN/CGA-B149.1-M91 (Natural Gas) or CAN/CGA-B149.2-M91 (Liquid Propane [L.P.] Gas) or LATEST EDITION (for General Installation and Gas Plumbing), as well as local codes and ordinances and must be done by a qualified professional. It is important that gas pressure regulators meet applicable pressure requirements, and that gas meters be rated for the total amount of ALL the appliance BTUs being supplied.

The dryer is provided with a 3/4” N.P.T. inlet pipe connection located at the right side of the base of the dryer. The minimum pipe size (supply line) to the dryer is 3/4” N.P.T. For ease in servicing, the gas supply line of each dryer must have its own shutoff valve.

The size of the main gas supply line (header) will vary depending on the distance this line travels from the gas meter or, in the case of L.P. gas, the supply tank, other gas-operated appliances on the same line, etc. Specific information regarding supply line size should be determined by the gas supplier.

NOTE: Undersized gas supply piping can create a low or inconsistent pressure, which will result in erratic operation of the burner ignition system.

27

Image 31
Contents MDG75V Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Receiving and Handling Important InformationWhat to do if YOU Smell GAS Safety PrecautionsPage Specifications SpecificationsMDG75V Component Identification Page Location Requirements Installation ProceduresUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Requirements General Exhaust Ductwork Information Exhaust RequirementsPage Page Multiple common Dryer Venting Importantventingreminders Electrical Requirements Electrical InformationMust be Provided SINGLE-PHASE 1Ø Electrical Connections Leads Important a Circuit Servicing Each Dryer Must be Provided Page MDG75V GAS GAS Information Type of GAS Page Page Preparation for OPERATION/START-UP GAS Models only Preoperational TestsBasket Tumbler Coating Shutdown Instructions Preoperational InstructionsService SERVICE/PARTS InformationParts Cleaning Routine MaintenanceSuggested Cleaning Schedule Lubrication AdjustmentsLint Drawer Removal Microprocessor Controller Computer Models TroubleshootingBlower motor is not operating does not start Microprocessor controller computer display reads dSFL GAS Models only Dryer operates but is taking too long to dry Dryer is making scraping noise at basket tumbler area Data Label Data Label InformationSerial Number Sectionviii Procedure for Functional Check Replacement ComponentsPage 113160 1 11/27/02-25