a.The pressure of the condensate in the steam supply will cause water hammer and subsequent heat exchanger (steam coil) failure. The steam supply connection into the main supply line must be made within a minimum 12-inch (30.48 cm) riser. This will prevent any condensate from draining towards the dryer.

b.The steam supply piping to the dryer must include a 12-inch (30.48 cm) rise along with a drip trap and check valve. This will prevent any condensate from entering the steam coil.

c.Flexible hoses or couplings must be used. The dryer vibrates slightly when it runs and this will cause the steam coil connections to crack if they are hard piped to the supply and return mains.

d.Shutoff valves for each dryer should be installed in the supply, return, and drip trap return lines. This will allow the dryer to be isolated from the supply and return mains if the dryer needs maintenance work.

e.Install an inverted bucket steam trap and check valve for each unit at least 12-inch (30.48 cm) below steam coil as close to the coil as possible.

1)A trap with a capacity of 1,200 lbs (544 kg) of condensate per hour at 125 PSI (8.61 bars) is needed for each unit.

f.A 3/4-inch (19.05 mm) vacuum breaker should be installed for each unit in the piping. This will prevent the condensing steam from causing a vacuum inside the coil and possibly damaging the coil.

g.The supply and return lines should be insulated. This will save energy and provide safety for the operator and maintenance personnel.

h.Water pockets in the supply line, caused by low points, will provide wet steam to the coil possibly causing coil damage. ALL horizontal runs of steam supply piping should be pitched 1/4-inch (6.35 mm) for every 1 foot (0.31 meters) back towards the steam supply header causing any condensate in the line to drain to the header. Install a bypass trap in any low point to eliminate wet steam.

33

Image 37
Contents ML-130 Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Routine Maintenance Receiving and Handling Important InformationWhat to do if YOU Smell GAS Safety PrecautionsStandards Specifications SPECIFICATIONS/COMPONENT IdentificationSpecifications Component Identification Page Location Requirements Installation ProceduresUNPACKING/SETTING UP Page This Exhaust Duct Transition Piece Must be Installed First Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Downstream of Dryer Page Page Page Electrical Information ML-130 II Reversing, 3ø GAS ML-130 II Reversing, 3ø Steam MLE-130 II 72 Kw Electric Reversing, 3ø MLE-130 II 80 Kw Electric Reversing, 3ø Page Page GAS Information Type of GAS Page Page Steam Information Operating Steam PressurePage Bars Page Preparation for Operation Preoperational Tests Basket Coating Operating Instructions Shut Down InstructionsPage Service SERVICE/PARTS InformationParts Returning Warranty Cards Warranty InformationWarranty Returning Warranty PartsPage Cleaning Routine MaintenanceSuggested Cleaning Schedule Steam Dryers Lubrication AdjustmentsData Label Data Label InformationSerial Number Timing Legend Reversing Timer SPIN/DWELL AdjustmentsProcedure for Functional Check Replacement Components Page Page P O R T a N T For Timer or Phase 5 Without Heat Fault ADC 113314 1- 06/21/01-25