American Dryer Corp ML-130 II installation manual Preparation for Operation

Page 40

I. PREPARATION FOR OPERATION

The following items should be checked before attempting to operate the dryer:

1.Read ALLCAUTION,” “WARNING,” and “DIRECTION” labels attached to the dryer.

2.Check incoming supply voltage to be sure that it is the same as indicated on the dryer data label located on the left side panel/wall area behind the control door as shown on page 9. In case of 208 VAC or 230/240 VAC, the supply voltage must match the electric service exactly.

3.GAS MODELS - check to assure that the dryer is connected to the type of heat/gas indicated on the dryer data label.

4.GAS MODELS - the sail switch damper assembly was installed and adjusted at the factory prior to shipping. However, each sail switch adjustment must be checked to assure that this important safety control is functioning.

5.GAS MODELS - be sure that ALL gas shutoff valves are in the open position.

6.Be sure ALL back panels (guards) and electric box covers have been replaced.

7.Check ALL service doors to assure that they are closed and secured in place.

8.Be sure lint drawer is securely in place.

NOTE: LINT DRAWER MUST BE ALL THE WAY IN PLACE TO ACTIVATE SAFETY SWITCH OTHERWISE THE DRYER WILL NOT START.

9.Rotate the basket (tumbler) by hand to be sure it moves freely.

10.Check bolts, nuts, screws, terminals, and fittings for security.

11.STEAM MODELS - check to insure air supply (80 PSI [5.51 bars]) is on the dryer.

12.STEAM MODELS - check to insure ALL steam shutoff valves are open.

13.STEAM MODELS - check steam damper operation.

14.Check basket (tumbler) bearing setscrews to insure they are ALL tight.

36

Image 40
Contents ML-130 Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Routine Maintenance Important Information Receiving and HandlingSafety Precautions What to do if YOU Smell GASStandards SPECIFICATIONS/COMPONENT Identification SpecificationsSpecifications Component Identification Page Installation Procedures Location RequirementsUNPACKING/SETTING UP Page This Exhaust Duct Transition Piece Must be Installed First Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Downstream of Dryer Page Page Page Electrical Information ML-130 II Reversing, 3ø GAS ML-130 II Reversing, 3ø Steam MLE-130 II 72 Kw Electric Reversing, 3ø MLE-130 II 80 Kw Electric Reversing, 3ø Page Page GAS Information Type of GAS Page Page Operating Steam Pressure Steam InformationPage Bars Page Preparation for Operation Preoperational Tests Basket Coating Shut Down Instructions Operating InstructionsPage Service SERVICE/PARTS InformationParts Warranty Information Returning Warranty CardsWarranty Returning Warranty PartsPage Cleaning Routine MaintenanceSuggested Cleaning Schedule Steam Dryers Adjustments LubricationData Label Information Data LabelSerial Number Reversing Timer SPIN/DWELL Adjustments Timing LegendProcedure for Functional Check Replacement Components Page Page P O R T a N T For Timer or Phase 5 Without Heat Fault ADC 113314 1- 06/21/01-25