Panasonic manual PAN4570 Carrierboard

Page 18

CLASSIFICATION

 

 

No.

 

 

REV.

Einstufung

 

 

DS-Eval4570-2400

 

C

SUBJECT

EvalBoard PAN4570

PAGE

 

 

 

Thema

 

 

Seite

18 of 20

 

CUSTOMER’S CODE

 

PANASONIC’S CODE

DATE

06.11.2006

EvalPAN4570

 

 

Datum

10.3. PAN4570 CARRIERBOARD

remarks:

1. PAN4570 is programmed per X2.

2. R1, R2 and R4 are not mounted

3. R3 is mounted as pulldown resistor at SIF_MOSI (10k typ.) X1-34 S_MOSI is connected to ground X1-33. The pulldown res. at SIF_MOSI is required for deep sleep current chars.

European Technology Center

Panasonic Electronic Devices (EUROPE) GmbH

APPROVED

genehmigt

CHECKED

geprüft

DESIGNED

Erstellt

Image 18
Contents Manual Evaluation-Board for PAN4570 Wireless Module Table of Contents Hardware Needed Contents of the Evaluation KITOverview Software NeededSetting UP the Evalboard Input buttons Output LEDs PAN4570 SMA socket Testboard LayoutJP2 Power Supply D.C. Power from a Power SupplyOperation of the Testboard JP3D.C. Power from a USB Device Power onReset Serial PortUpload of Emberznet Sample Applications Begin upload CCCCCC…Selecting the Hardware Platform LED GpioEmbertm Insight Adaptor Configuration Ember Zigbee Implementation Flash Programming of PAN4570For details on using the em2xxload.exe utility see also Classification REV Vbat Reset Rstb Sifclk Sifmiso Sifmosi SifloadbDevelopment of Applications GPIO4 GPIO5Testing for IEEE802.15.4 Parameters ChannelSchematic of the ISM RF Transceiver Testboard SheetSheet PAN4570 Carrierboard Related Documents Document StatusHistory for this Document General Information Life Support Policy