Setting Up the Chassis
3.Route SCSI/SATA data cables through the chassis openings located near the bottom of the drive cage. Connect data cables to the respective fixed drive and to the appropriate connector on the server board.
To
Upper
Bay Cables
TP00552
To
Figure 14. Routing SCSI/SATA Data Cables
Install 3.5-inch Floppy Drive
1.Press pair of slides inward (letter “A”) to release and pull slide/filler panel assembly out of upper device bay. Remove EMI panel from bracket (letter “B”).
A
A
B
TP00535
Figure 15. Removing Slide/Filler Panel Assembly from Upper Device Bay
2. Use a flat blade screwdriver to remove the
18 | Intel® Server Chassis SC5300 User Guide |