Maintaining Your Server
4.Attach front panel cable (letter “A”) before installing the new Front Panel Board into the chassis to ensure the cable pins line up correctly. Place the new Front Panel Board in the chassis. Insert and tighten the three screws (letter “B”) removed earlier. Connect the optical switch cable (letter “C”) or, for
A
B
C
TP00692
Figure 51. Installing the Front Panel Board
5.Replace the Bezel Assembly (see “Install Bezel Assembly” in Chapter 2 for
6.Replace the Primary Access Cover (see “Install Primary Access Cover” in Chapter 2 for step-
Replacing a Fixed Power Supply
WARNINGS
Hazardous conditions, power supply: Hazardous voltage, current, and energy levels are present inside the power supply. There are no
1.Disconnect all power cables from chassis after shutting down the server.
2.Remove the Primary Access Cover (see “Remove Primary Access Cover” in Chapter 2 for
3.Disconnect all internal power cables from chassis components and server board.
44 | Intel® Server Chassis SC5300 User Guide |