Intel SC5300 BRP, SC5300 LX Install Hot Swap Drives, Releasing Drive Carrier from Hot Swap Cage

Page 43

Setting Up the Chassis

Install Hot Swap Drive(s)

1.Press in on the green latch (letter “A”) at the end of the drive carrier to disengage it from the hot swap drive cage. Pull out on the black lever (letter “B”) to fully open the drive carrier. When the lever reaches a fully opened position, it will push the drive carrier out from the hot swap drive cage.

A

B

TP00918

Figure 28. Releasing Drive Carrier from Hot Swap Cage

2.Slide the drive carrier out of the drive cage.

3.Remove the four screws that secure the plastic retention device to the drive carrier. Remove the plastic retention device.

TP00928

Figure 29. Removing Plastic Retention Device

4.Secure the hard drive to the drive carrier using the four screws that were formerly attached to the plastic retention device. Ensure that the connector end of the hard drive is facing the back of the drive carrier. The label side of the hard drive should be facing up in the drive carrier.

TP00929

Figure 30. Securing Hard Drive to Drive Cage

Intel® Server Chassis SC5300 User Guide

25

Image 43
Contents Order Number C51486-003 Intel Server Chassis SC5300 User Guide Manual Organization PrefaceAdditional Information and Software Safety Information Safety Cautions Intel Server Chassis SC5300 User Guide Vii Wichtige Sicherheitshinweise 重要安全指导 Consignes de sécurité Instrucciones de seguridad importantes Xii Intel Server Chassis SC5300 User Guide Xiii Xiv Contents Equipment Log and Worksheets Figures Tables Feature Summary Kit ContentsChassis Description Intel Server Chassis SC5300 Base Front View Chassis Front View SC5300 BaseIntel Server Chassis SC5300 LX Front View Chassis Front View SC5300 LX with Hot Swap ComponentsPedestal Controls and Indicators Front Panel Controls and IndicatorsFront Panel LED Descriptions Intel Server Chassis SC5300 Base Chassis Rear View Base Chassis Rear ViewBase Redundant Power and SC5300 LX Chassis Rear View Standard and Optional Hot Swap Drive Bays PeripheralsChassis Side View Half-height Peripheral BaysAccessories and Order Codes Accessories and Order CodesTools and Supplies Needed Setting Up the ChassisInstallation Safety Instructions Safety Before You Remove the Access CoverSetting Up the Chassis Removing the Access Cover Remove Primary Access CoverRemoving Bezel Assembly Remove Bezel AssemblyRemoving Air Ducts Remove Air DuctsRemoving Hot Swap Fans Remove Hot Swap FansRemoving PCI Add-in Card Retainer Route Power and Data Cables to the Fixed DrivesRouting Power Cables to Fixed Drives Routing SCSI/SATA Data Cables Install 3.5-inch Floppy DriveInstalling Slides on 3.5-in Floppy Drive Installing a DVD or CD-ROM Drive Install DVD or CD-ROM DriveRemoving Six-drive Fixed Drive Cage from Chassis Install Fixed Hard DrivesOpen the lower door Installing Device Slides to Hard Drive Close the lower door of drive cage Releasing Drive Carrier from Hot Swap Cage Install Hot Swap DrivesInserting Drive Carrier into Drive Cage Install Hot Swap FansInstall Air Dam Install Server BoardConnect Cables to Server Board Securing Cables in Chassis with a Hot Swap Power SupplyRemove PCI Add-in Card Retainer Install Add-in BoardsPreparing the Chassis for a PCI Add-in Board Repeat until all PCI add-in cards are installed Reinstall the PCI Add-in Card Retainer Removing Inner Plastic Air Baffle from Processor Air Duct Install Air DuctsInstalling Air Ducts Removing Power Supply Filler Panel Install an Additional Hot Swap Power Supply ModuleInstalling Bezel Assembly Install Bezel Assembly Pedestal OnlyInstalling the Access Cover Install Primary Access CoverSetting Up the Chassis Maintaining Your Server Safety Before You Remove the Access CoversMaintaining Your Server Removing a Fixed Fan Replacing a Fixed Fan For Base and BRP Chassis OnlyRemoving a Hot Swap Fan Replacing a Hot Swap FanRemoving the Front Panel Board Replacing the Front Panel BoardInstalling the Front Panel Board Replacing a Fixed Power SupplyRemoving Fixed Power Supply Removing a Hot Swap Power Supply Replacing a Hot Swap Power SupplyRemoving Hot Swap Power Supply Replacing a Power Distribution BoardRemoving Center Divider Removing Power Distribution Board Securing Power Distribution Board to Power Supply Cage Reinstalling Center Divider Removing Fixed Power Supply Releasing Center Divider from Power Supply Cage Removing Center Divider from Power Supply Cage Inserting Power Distribution Board in Power Supply Cage TP01997 Reinstalling Hot Swap Power Supply Maintaining Your Server Technical Reference Power Supply SpecificationsSingle Power Supply Input Voltages Single Power Supply Output Voltages+3.3 24 a +5.0 +5 V Standby +12.0 48 a Environmental Specifications System Environmental SpecificationsEquipment Log Equipment Log and WorksheetsEquipment Log Current Usage Calculating Power UsageWorksheet, Total Combined Power Used by the Server Product EMC Compliance Class a Compliance Product Safety ComplianceRegulatory and Compliance Information Product Regulatory ComplianceProduct Regulatory Compliance Markings Certifications / Registrations / DeclarationsFCC USA Electromagnetic Compatibility NoticesEurope CE Declaration of Conformity Industry Canada ICES-003Bsmi Taiwan Vcci JapanKorean RRL Compliance Regulated Specified Components World Wide Web Telephone Getting HelpMiami Limited Warranty for Intel Chassis Subassembly Products WarrantyExtent of Limited Warranty Limitations of Liability Warranty Limitations and ExclusionsTelephone Support How to Obtain Warranty ServiceReturning a Defective Product