3.Open the left side cover on the scanner unit with the hex wrench (supplied).
4.Unfasten the cable gland for the multicore cable and remove the gasket and flat washers.
5.As shown in Figure
6.Fold back armor by 5 mm and pass it through the two flat washers as shown in Figure
Gasket | Armor (folded back) |
|
Seal with putty after tightening.
Vinyl sheath
Clamping gland
Flat |
|
| Cable gland |
washer |
|
| |
Flat |
|
| |
|
| Flat | |
|
| ||
|
|
| |
| washer | ||
| washer | ||
|
|
|
Figure 2-9 Passing clamping gland, washers and gasket on the multicore cable
7. Shorten conductors considering their locations on the terminal board
Figure 2-10 Scanner unit, port side view
8. Confirm that armor is grounded between two flat washers.