Furuno FA-100 manual Cable fabrication, Connection

Page 20

Cable Connection at Junction Box

Cable fabrication

Armor Sheath Shield

5 to 6 mm

30

Clamp here by cable clamp.

Connection

1

2

3

Core 5-6 mm

Procedure

1.Insert driver from direction 1 .

2.Tilt slightly toward 2 .

3.Insert cable core to 3 .

14

Image 20 Contents
Uais Transponder 00080932513 Safety Instructions Table of Contents System Configuration GPS/VHFOptional supply Equipment ListsStandard supply Extending antenna cable MountingAntenna Unit How to attach connector N-P-8DFB VHF antenna Location Horizontal separation distance How to attach the plug M-P-7 3 GPS/VHF combined antennaMounting procedures Installing distributor unit DB-1 Transponder Unit Desktop mountingFlush mount kit B Type OP24-2 Code no Flush mountingFlush mount kit a Type OP24-1 Code no Junction Box MountingPower Supply option Pilot Plug optionWiring GPS/VHF Conbined Antenna GVA-100 Distributor unit DB-1Armor Cable fabrication ConnectionINPUT/OUTPUT Signal Inputs from SensorsInput/Output of AIS Signal TB1 in the junctionboxInput of Gyrocompass Signal Alarm Signal OutputLAN Input/Output Pilot PlugJumper Setting in the Junction Box Input/Output Sentences GngpgllcinChanging Ship’s Mains Specifications 100-115 VAC White BlackSetting and Adjustment Setting MMSI, IMO No., Name and Call SignPage Setting GPS Antenna Position and Ship’s Type SET Antenna POS windowPress the ENT key to return to the Init Setting sub-menu System Settings System Settings sub-menuPriority window Error message SET LAN IP Addr window This page is intentionally left blank Packing List CB-100-A、CB-100-A-HK GVA-100 工事材料表 PR-240-CE GP-1850,GP-1650,FA-100,GP-1640/F SC-60/120,GD/GP-280/680/380 20AG-X-9405 マスト取付金具 Page Page Page Page May 20 Page Jan Jan Page Page Page Page Page Hatai