Sterling SSC1-5Q service manual Long Tones, High vaccum alarm will sound in Short Tones

Page 25

1.Press the green START pushbutton in. The controller will display “✷✷✷” in the lower right corner of station and pump setup screens.

Once the system has been started, each active station is polled in sequence for a demand signal. The convey sequence upon initiation, will continue until the set convey time has elapsed or the demand signal stops, whichever happens first. If the Special Timed Convey feature is enabled, conveying will continue until the convey time has elapsed. (Once station dump delay has been initiated during the convey sequence, a new demand signal will be ignored.) If the blowback sequence begins immediately following the convey sequence, the sequence valve will remain open throughout the blowback sequence.

2.If during operation, a station conveys the specified number of consecutive times without clearing the demand signal, the NO CONVEY alarm will activate. Press the ALARM SILENCE pushbutton and hold it in to clear the alarm. The no convey alarm will sound in

LONG TONES.

3.Should the high vacuum pressure switch activate, the HIGH VACUUM alarm will sound. Press the ALARM SILENCE pushbutton and hold it in to clear the alarm.

The high vaccum alarm will sound in SHORT TONES.

4.If the pump motor contactor fails or the pump motor overload trips, the PUMP FAULT alarm will be activated. Press the ALARM SILENCE pushbutton and hold it in to clear the alarm. The pump fault alarm will sound in a

CONTINUOUS TONE.

5.To stop conveying, depress the green START pushbutton. The controller will no longer display “✷✷✷” on the station and pump setup screens.

Page 24 of 38

Image 25
Contents SSC1-5Q Parts and Service Department Model # Serial # Table of Contents Configurable Settings Charts and Figures Safety Considerations Sterling SSC1-5Q Conveying Systems Pump 5-Station Controller Equipment Function General InformationNecessary Documents System CapabilitiesModels Covered by this Manual Equipment CycleSSC1-5Q 5-Station Controller SSC1-5Q Controller Safety Considerations SafetyWork Rules Tools and Equipment NeededGeneral Responsibility Reporting a Safety DefectOperator Responsibility Maintenance ResponsibilitySafety Circuit Standards Safety DevicesFail Safe Operation Safety Device Lock-Outs Page Unpacking and Inspection Shipping InformationEvent of Shipping Damages Parcel Post ShipmentIf the Shipment is Not Complete United Parcel Service ShipmentIf the Shipment is Not Correct ReturnsInstalling the SCC1-5Q Control Panel InstallationMaking SSC1-5Q Control Panel Power Drop Wiring Connections Connecting the Control Panel to Vacuum ReceiversSpecial Timed Convey Connecting the Control Panel to the Pump PackageSetup Using the ControllerBasic Menus and Setup of Controller IntroductionSetting Blowback Parameters Setting Pump ParametersStarting the System Changing ParametersLong Tones High vaccum alarm will sound in Short TonesOptions for Station Setup 6Configurable SettingsIdle Options for Pump Setup7Maintenance General Troubleshooting TroubleshootingStation Alarms AlarmsPump Alarms Options Remote Audible/visual alarm230/1/60 Operation CE Package for 220/1/50 OperationRecommended Spare Parts List Spare Parts ListContact Information for Technical Assistance Technical AssistanceReturned Material Policy Warranty ReturnsCredit Returns Warranty Controller Safety Tags Safety Tag InformationController Identification Serial Number Tag Appendix Page Service Department