Sherwood SRB3600 manual External Air Leaks

Page 22

6.5.4 External Air Leaks

1Attach the regulator first stage to a tank short enough to totally submerge the first and second stage in your filling station cooling water.

2.With the tank valve still turned off, flood the second stage completely with water, and then position it mouthpiece up.

3.Turn the tank air valve on slowly and then watch for any leaks in the first or second stage (except for the normal flow of air from the one-way bleed valve on the first stage). Look particularly closely at the first stage area where the adjusting module meets the body. If the module-to-body O-ring 18 is in the wrong groove, you will see air leaking from between the module and the body instead of from the black one-way bleed valve system.

4.Repair any leaks.

5.Check for the correct positive air purge flow rate. See Section 5.4, Testing of First Stage, for the proper method.

19

Image 22
Contents Regulators First Stage Maximus SRB3600 Item # Catalog # DescriptionTable of Contents Introduction Maximus SRB3600 regulatorFirst Stage Regulator SRB3601 SpecificationsGeneral Specifications for the SRB3600 Maximus Regulator Second Stage Regulator SRB3602Rings Reference Chart First Stage Features Special Features of the Maximus SRB3600 RegulatorSecond Stage Features Before YOU Begin First Stage ProceduresTools Required for First Stage Servicing Photo #1 Disassembly Of First StagePhoto #2 Photo #3 Photo #4Photo #5 Photo #6Photo #7 Assembly of First Stage Testing Of First Stage Before You Begin Testing Dry Air Bleed flow TestIntermediate Pressure Test Disassembly Of Second Stage Second Stage ProceduresTools Required for Second Stage Serving Page Assembly of Second Stage Page SET-UP of Second Stage Exhalation Effort Testing Of Second Stage Inhalation effortLeak Test External Air Leaks Troubleshooting Regulators Helpful HintsParts Cleaning Recommendations No AIR Coming from DRY AIR Bleed Valve on First StageHandling Tips Commonly Used Cleaning SolutionsPre-Dive Checks Post-Dive Care Proper Procedure for Warranty Paperwork TWO Year Warranty and Maintenance InformationScheduled Maintenance Second Stage Maximus SRB3602 G010A Ring hose outlet end G011B Ring hose inlet endGoodrich Road Clarence Ctr, New York