Sherwood manual General Specifications for the SRB3600 Maximus Regulator

Page 5

2.0SPECIFICATIONS

2.1GENERAL SPECIFICATIONS FOR THE SRB3600 MAXIMUS REGULATOR

REGULATOR MODEL:

Sherwood SRB3600 Maximus

AIR FLOW:

32 cu. ft./min. (850 liters)/min. @ 1 atmosphere

INHALATION RESISTANCE:

1.1" w.c. (2.8 cm w.c.) @ 1 atmosphere

EXHALATION RESISTANCE:

0.5" w.c. (1.3 cm w.c.) max. @ 1 atm.

RECOMMENDED LUBRICANT:

LTI Christo-Lube®MCG#111, Dow Corning #111

 

Compound®, Parker Super O-Lube®, or equivalent

2.2.First Stage Regulator (SRB3601)

TYPE:

Externally adjustable, flow-by piston with Moving

 

orifice balancing, and Positive Air Purge (Dry Air Bleed),

 

U.S. Pat. # 4,226,257

WEIGHT:

1 lb. 11 oz. (.8kg)

INTERSTAGE PRESSURE:

120 -150 psi (8.3-10 Bar)

MAXIMUM INLET PRESSURE:

232 Bar for SRB3600CE Model

POSITIVE AIR PURGE

 

FLOW RATE:

13-25 cc/minute

# LOW PRESSURE PORTS:

5 (3/8"-24 UNF)

# HIGH PRESSURE PORTS:

1 (7/16"-20 UNF)

MATERIALS:

Body – CDA-360 Brass

 

O-ringsBuna-N

 

Bleed Valve – Ethylene Propylene

 

Piston Seat – Teflon®

2.3.Second Stage Regulator (SRB3602):

TYPE:

Downstream poppet, diaphragm, externally –

 

adjustable, with underarm hose routing

WEIGHT:

8 oz. (.23 kg) w/o hose

HOSE LENGTH:

40 in. (1.02 m)

MATERIALS :

Cover –Thermoplastic Triax®

 

Case –Thermoplastic Triax®

 

Poppet Seat – Buna-N

 

O-RingsBuna-N

 

Diaphragm – Tufel® (blue)

 

Exhaust Valve – Thermoplastic Elastomer

 

Wisdom® Mouthpiece - C-Flex®

Maximum certified depth is 50m.

2

Image 5
Contents Regulators Item # Catalog # Description First Stage Maximus SRB3600Table of Contents Maximus SRB3600 regulator IntroductionGeneral Specifications for the SRB3600 Maximus Regulator SpecificationsFirst Stage Regulator SRB3601 Second Stage Regulator SRB3602Rings Reference Chart Second Stage Features Special Features of the Maximus SRB3600 RegulatorFirst Stage Features Tools Required for First Stage Servicing First Stage ProceduresBefore YOU Begin Photo #2 Disassembly Of First StagePhoto #1 Photo #4 Photo #3Photo #6 Photo #5Photo #7 Assembly of First Stage Dry Air Bleed flow Test Testing Of First Stage Before You Begin TestingIntermediate Pressure Test Tools Required for Second Stage Serving Second Stage ProceduresDisassembly Of Second Stage Page Assembly of Second Stage Page SET-UP of Second Stage Leak Test Testing Of Second Stage Inhalation effortExhalation Effort External Air Leaks Helpful Hints Troubleshooting RegulatorsNo AIR Coming from DRY AIR Bleed Valve on First Stage Parts Cleaning RecommendationsPre-Dive Checks Commonly Used Cleaning SolutionsHandling Tips Post-Dive Care Scheduled Maintenance TWO Year Warranty and Maintenance InformationProper Procedure for Warranty Paperwork G010A Ring hose outlet end G011B Ring hose inlet end Second Stage Maximus SRB3602Goodrich Road Clarence Ctr, New York