Sherwood SRB3600 manual Disassembly Of First Stage, Photo #1, Photo #2

Page 9

5.2DISASSEMBLY Of FIRST STAGE

To view all the parts used in the first stage, fold out the front cover of this manual. The circled numbers below refer to the corresponding numbers on the drawing.

1.Use 6" or 8" adjustable wrenches to disconnect all hoses from the first stage. Pull back the hose protector from the inlet end of the hose. Inspect the hoses for wear. Pay particular attention to the area where the metal ferrules meet the rubber hose material. Replace hoses if necessary.

2.Unscrew and remove the handwheel 1 .

3.Remove the dust cap 8 .

4.Install a Sherwood regulator support handle (p/n 4700-15) into one of the low-pressure ports. Use the support handle and a 15" adjustable wrench or bench vise to loosen the yoke nut from the body 15. See Photo # 1.

Photo #1

5.Remove the yoke 10 and yoke nut 9 from the body.

NOTE: If a Sherwood DIN adapter (p/n SAA530O) is installed in place of the normal yoke assembly, remove it

at this time. See Sherwood Scuba Technical Bulletin #104 for servicing procedures for the SAAS300 DIN adapter.

6.Use a 5/32" Allen wrench to remove all remaining port plugs 11 17 from the main body 17 .

7.

Use a 3/32" Allen wrench to remove the locking Allen screw 14 from the main body

 

(see Photo #2).

Photo #2

6

Image 9
Contents Regulators Item # Catalog # Description First Stage Maximus SRB3600Table of Contents Maximus SRB3600 regulator IntroductionGeneral Specifications for the SRB3600 Maximus Regulator SpecificationsFirst Stage Regulator SRB3601 Second Stage Regulator SRB3602Rings Reference Chart Special Features of the Maximus SRB3600 Regulator First Stage FeaturesSecond Stage Features First Stage Procedures Before YOU BeginTools Required for First Stage Servicing Disassembly Of First Stage Photo #1Photo #2 Photo #4 Photo #3Photo #6 Photo #5Photo #7 Assembly of First Stage Dry Air Bleed flow Test Testing Of First Stage Before You Begin TestingIntermediate Pressure Test Second Stage Procedures Disassembly Of Second StageTools Required for Second Stage Serving Page Assembly of Second Stage Page SET-UP of Second Stage Testing Of Second Stage Inhalation effort Exhalation EffortLeak Test External Air Leaks Helpful Hints Troubleshooting RegulatorsNo AIR Coming from DRY AIR Bleed Valve on First Stage Parts Cleaning RecommendationsCommonly Used Cleaning Solutions Handling TipsPre-Dive Checks Post-Dive Care TWO Year Warranty and Maintenance Information Proper Procedure for Warranty PaperworkScheduled Maintenance G010A Ring hose outlet end G011B Ring hose inlet end Second Stage Maximus SRB3602Goodrich Road Clarence Ctr, New York