Sherwood SRB5700, SRB5100, SRB5900, SRB5300 manual D. External Air Leaks

Page 22
Image 22
Contents SRB5300 Assembly & Maintenance GuideREGULATORS SRB5900CATALOG # ITEM #DESCRIPTION 3.0 O-rings Reference Chart TABLE OF CONTENTSPage 1.0 Introduction 2.0 Specifications 6.0 Helpful Hints1.0 INTRODUCTION Page First Stage Regulator 2.0 SPECIFICATIONSB. Second Stage Regulator U.S. Pat. # 4,226,257 2.2 SPECIFICATIONS FOR THE SRB5100 BRUT REGULATORU.S. Pat. #3,991,785 3.0 O-RINGS REFERENCE CHART 4.2 DISASSEMBLY OF FIRST STAGE 4.0 FIRST STAGE PROCEDURES4.1 TOOLS REQUIRED FOR FIRST STAGE SERVICING Photo #1 Photo #2 Photo #3 4.3 ASSEMBLY OF FIRST STAGE A. Before You Begin Testing 4.4 TESTING OF FIRST STAGEB. Dry Air Bleed Flow Test C. Intermediate Pressure Test 5.2 DISASSEMBLY OF SECOND STAGE 5.0 SECOND STAGE PROCEDURES5.1 TOOLS REQUIRED FOR SECOND STAGE SERVICING 10. Remove the O-ring 21 from the adjustable orifice 5.3 ASSEMBLY OF SECOND STAGE 70 in. lbs. 8 joules5.4 SET- UP OF SECOND STAGE For the following adjustments, remove the cover and diaphragmPhoto #4 Photo #5B. Exhalation Effort 5.5 TESTING OF SECOND STAGE A. Inhalation EffortC. Leak Test D. External Air Leaks A. High Inhalation Effort at Depth 6.1 TROUBLESHOOTING REGULATORS6.0 HELPFUL HINTS B. Free FlowingC. Wet Breathing D. Humming or Buzzing During Inhalation6.4 HANDLING TIPS 6.2 PARTS CLEANING RECOMMENDATIONS6.3 COMMONLY USED CLEANING SOLUTIONS A. Pre-Dive ChecksB. Post-Dive Care 7.1 PROPER PROCEDURE FOR WARRANTY PAPERWORK 7.0 TWO YEAR WARRANTY AND MAINTENANCE INFORMATION7.2 SCHEDULED MAINTENANCE CATALOG # All other names are trademarks of their respective owners 6204 Goodrich Road Clarence Ctr, New YorkALL PRODUCTS SUBJECT TO CHANGE WITHOUT NOTICE Part Number S-MAN2004