Sherwood SRB5300, SRB5100, SRB5900, SRB5700 manual C. Intermediate Pressure Test

Page 15
C.Intermediate Pressure Test

C.Intermediate Pressure Test

NOTE: This test determines the regulator’s lock-up pressure (the pressure put out by the first stage during a no-flow condition).

1.Attach any Sherwood second stage to one of the low pressure ports, and the Sherwood intermediate pressure gauge (p/n TL119) to another low pressure port. Plug all other ports with appropriate port plugs.

2.Attach the regulator to a tank valve giving a source pressure of between 2700 and 3500 psig (186 and 240 bar).

3.Turn the supply air on slowly while listening for any unusual air leaks. If any are heard, turn the air off immediately and determine the source of the leak. If no leaks are found, watch the pressure gauge reading rise as you continue turning the air on slowly. It should stop around 145 psig (10 bar).

4.If the pressure gauge continues to rise above 155 psig (10.4 bar), turn the air supply off immediately and inspect the regulator to determine the cause.

5.Once the air pressure stops rising, the internal parts should be worked into place by allowing air to escape from the second stage several times by pushing the purge button.

6.If you have depressed the purge button several times and the pressure is below 135 psig (9.3 bar), you can add shims 20 to increase the pressure. Do not use more than three shims.

7.If the pressure is too high (above 150 psig or 10.3 bar), remove the necessary shims.

8.After the correct pressure has been reached, let the regulator sit for several minutes and then depress the purge button again to check that the regulator returns to the proper pressure.

Never set the output pressure of the first stage above 150 psig (10.3 bar).

12

Image 15
Contents SRB5900 Assembly & Maintenance GuideREGULATORS SRB5300ITEM # CATALOG #DESCRIPTION 6.0 Helpful Hints TABLE OF CONTENTSPage 1.0 Introduction 2.0 Specifications 3.0 O-rings Reference Chart1.0 INTRODUCTION Page 2.0 SPECIFICATIONS First Stage RegulatorB. Second Stage Regulator 2.2 SPECIFICATIONS FOR THE SRB5100 BRUT REGULATOR U.S. Pat. # 4,226,257U.S. Pat. #3,991,785 3.0 O-RINGS REFERENCE CHART 4.0 FIRST STAGE PROCEDURES 4.2 DISASSEMBLY OF FIRST STAGE4.1 TOOLS REQUIRED FOR FIRST STAGE SERVICING Photo #1 Photo #2 Photo #3 4.3 ASSEMBLY OF FIRST STAGE 4.4 TESTING OF FIRST STAGE A. Before You Begin TestingB. Dry Air Bleed Flow Test C. Intermediate Pressure Test 5.0 SECOND STAGE PROCEDURES 5.2 DISASSEMBLY OF SECOND STAGE5.1 TOOLS REQUIRED FOR SECOND STAGE SERVICING 10. Remove the O-ring 21 from the adjustable orifice 70 in. lbs. 8 joules 5.3 ASSEMBLY OF SECOND STAGEFor the following adjustments, remove the cover and diaphragm 5.4 SET- UP OF SECOND STAGEPhoto #5 Photo #45.5 TESTING OF SECOND STAGE A. Inhalation Effort B. Exhalation EffortC. Leak Test D. External Air Leaks B. Free Flowing 6.1 TROUBLESHOOTING REGULATORS6.0 HELPFUL HINTS A. High Inhalation Effort at DepthD. Humming or Buzzing During Inhalation C. Wet BreathingA. Pre-Dive Checks 6.2 PARTS CLEANING RECOMMENDATIONS6.3 COMMONLY USED CLEANING SOLUTIONS 6.4 HANDLING TIPSB. Post-Dive Care 7.0 TWO YEAR WARRANTY AND MAINTENANCE INFORMATION 7.1 PROPER PROCEDURE FOR WARRANTY PAPERWORK7.2 SCHEDULED MAINTENANCE ITEM # Part Number S-MAN2004 6204 Goodrich Road Clarence Ctr, New YorkALL PRODUCTS SUBJECT TO CHANGE WITHOUT NOTICE All other names are trademarks of their respective owners