Sherwood SRB5300 manual Table Of Contents, Page 1.0 Introduction 2.0 Specifications, Helpful Hints

Page 3

TABLE OF CONTENTS

Page

1.0 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1

2.0 Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3

2.1 SRB5700 (Oasis), SRB5900 (Blizzard), SRB5300 (Magnum) . .3

2.2 SRB5100 (Brut) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4

3.0 O-rings Reference Chart . . . . . . . . . . . . . . . . . . . . . . . . . . .5

4.0 First Stage Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 4.1 Tools Required for First Stage Servicing . . . . . . . . . . . . . . . .6 4.2 Disassembly of First Stage . . . . . . . . . . . . . . . . . . . . . . . . . .6 4.3 Assembly of First Stage . . . . . . . . . . . . . . . . . . . . . . . . . . . .10 4.4 Testing of First Stage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11

5.0 Second Stage Procedures . . . . . . . . . . . . . . . . . . . . . . . . .13 5.1 Tools Required for Second Stage Servicing . . . . . . . . . . . . . .13 5.2 Disassembly of Second Stage . . . . . . . . . . . . . . . . . . . . . . . .13 5.3 Assembly of Second Stage . . . . . . . . . . . . . . . . . . . . . . . . . .15 5.4 Set-Up of Second Stage . . . . . . . . . . . . . . . . . . . . . . . . . . . .16 5.5 Testing of Second Stage . . . . . . . . . . . . . . . . . . . . . . . . . . . .18

6.0 Helpful Hints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20

6.1 Troubleshooting Regulators . . . . . . . . . . . . . . . . . . . . . . . . . .20

6.2 Parts Cleaning Recommendations . . . . . . . . . . . . . . . . . . . . .22

6.3 Commonly Used Cleaning Solutions . . . . . . . . . . . . . . . . . . .22

6.4 Handling Tips . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22

7.0 Two Year Warranty and Maintenance Information . . . . . . .24 7.1 Proper Procedure for Warranty Paperwork . . . . . . . . . . . . . .24 7.2 Scheduled Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . .24

BEFORE YOU BEGIN.....

READ THESE INSTRUCTIONS COMPLETELY BEFORE YOU BEGIN SERVICING THE REGULATOR.

THESE INSTRUCTIONS ARE INTENDED FOR PEOPLE WHO HAVE BEEN AUTHORIZED BY SHERWOOD TO REPAIR SHERWOOD SCUBA EQUIPMENT. IF YOU ARE NOT SO AUTHORIZED - STOP.

Image 3
Contents SRB5900 Assembly & Maintenance GuideREGULATORS SRB5300ITEM # CATALOG #DESCRIPTION 6.0 Helpful Hints TABLE OF CONTENTSPage 1.0 Introduction 2.0 Specifications 3.0 O-rings Reference Chart1.0 INTRODUCTION Page 2.0 SPECIFICATIONS First Stage RegulatorB. Second Stage Regulator 2.2 SPECIFICATIONS FOR THE SRB5100 BRUT REGULATOR U.S. Pat. # 4,226,257U.S. Pat. #3,991,785 3.0 O-RINGS REFERENCE CHART 4.0 FIRST STAGE PROCEDURES 4.2 DISASSEMBLY OF FIRST STAGE4.1 TOOLS REQUIRED FOR FIRST STAGE SERVICING Photo #1 Photo #2 Photo #3 4.3 ASSEMBLY OF FIRST STAGE 4.4 TESTING OF FIRST STAGE A. Before You Begin TestingB. Dry Air Bleed Flow Test C. Intermediate Pressure Test 5.0 SECOND STAGE PROCEDURES 5.2 DISASSEMBLY OF SECOND STAGE5.1 TOOLS REQUIRED FOR SECOND STAGE SERVICING 10. Remove the O-ring 21 from the adjustable orifice 70 in. lbs. 8 joules 5.3 ASSEMBLY OF SECOND STAGEFor the following adjustments, remove the cover and diaphragm 5.4 SET- UP OF SECOND STAGEPhoto #5 Photo #45.5 TESTING OF SECOND STAGE A. Inhalation Effort B. Exhalation EffortC. Leak Test D. External Air Leaks B. Free Flowing 6.1 TROUBLESHOOTING REGULATORS6.0 HELPFUL HINTS A. High Inhalation Effort at DepthD. Humming or Buzzing During Inhalation C. Wet BreathingA. Pre-Dive Checks 6.2 PARTS CLEANING RECOMMENDATIONS6.3 COMMONLY USED CLEANING SOLUTIONS 6.4 HANDLING TIPSB. Post-Dive Care 7.0 TWO YEAR WARRANTY AND MAINTENANCE INFORMATION 7.1 PROPER PROCEDURE FOR WARRANTY PAPERWORK7.2 SCHEDULED MAINTENANCE ITEM # Part Number S-MAN2004 6204 Goodrich Road Clarence Ctr, New YorkALL PRODUCTS SUBJECT TO CHANGE WITHOUT NOTICE All other names are trademarks of their respective owners