Napoleon Fireplaces BGP42, BGD42 manual Nailing TAB Installation, Tab

Page 19

FIGURE 34

FIGURE 35a-c

19

NAILING TAB INSTALLATION

1)Attach the nailing tabs to the corner posts using the 2 sheet metal screws supplied. Secure through the centre of the top and bottom slots in the nailing tab and then through the existing holes in the corner posts.

If there are no existing holes, follow these instructions:

Position the nailing tab so that the front face is offset with the front edge of the corner post (approx. ½"). Centre the nailing tab vertically on the corner post.

Figure 36 a.

Drill through the centre of the top and bottom

NAILING

slots in the nailing tab. Secure using the two

TAB

sheet metal screws supplied. This allows the

 

nailing tab to slide back and forth for desired

 

framing. Figure 36b.

 

2)To determine the fi nal location of the nailing tab you must fi rst determine the thickness of your fi nishing material (i.e. drywall). This will determine the dimension from the front edge of the corner post to the nailing tab. Once the nail- ing tab is in the desired location, drill through the centre hole of the nailing tab. Secure with a sheet metal screw*. Figure 36c.

* Additional set screws may be installed.

FIGURES 36a-c

CORNER

POST

NAILING

TAB

TOP SLOT

A

B

 

FINISHING

 

MATERIAL

CENTRE

HOLE

C

W415-0381 / H / 12.07.07

Image 19
Contents W415-0381 / H $10.00 BGD42 Table of Contents Napoleon GAS Fireplace Presidents Lifetime Limited Warranty General Information General InstructionsCare of GLASS, and Plated Parts Installation Overview Venting Lengths VentingMinimum AIR Terminal Location Clearances Special Vent Installations Typical Vent InstallationsVertical Termination Venting Application Flow ChartDefinitions Horizontal TerminationElbow Vent Length Values Formula 1 HT 4.2 VT Formula 2 HT + VT 24.75 feet Simple venting confi gurations Vertical TerminationFormula 1 HT 3VT Formula 2 HT + VT 40 feet Horizontal Installation Installation Wall and Ceiling ProtectionSee Figure Using Flexible Vent ComponentsFireplace Vent Connection Using Rigid Vent ComponentsRestricting Vertical Vents Vertical Venting InstallationGAS Installation Optional Wall Switch InstallationFraming Mobile Home InstallationTAB Nailing TAB InstallationFinishing L42 Louvre InstallationPorcelain Reflective Panels Logo PlacementVermiculite Optional Blower InstallationOptional FAN Installation Charcoal EmbersOperating Instructions Operation / MaintenanceMaintenance GD36 Thermostatic Sensor ControlVenturi Adjustment AdjustmentsPilot Burner Adjustment Flame CharacteristicsReplacement Parts ReplacementsAccessories W415-0381 / H Symptom Problem Test Solution Trouble Shooting GuideFlames are very ag Door is ajar