2. Framing the Fireplace

The North Star Fireplace will fit the framed opening width of 43-7/8” tall. The finished cavity depth must be no less than 24”. Framing must extend straight up all the way to the ceiling.

Figure 10A shows a typical framing (using 2 x 4 lumber) of the fireplace, assuming combustible materials are used. All required clearances to combustibles around the fireplace must be adhered to. Any framing across the top of the fireplace must be above the level of the top standoffs.

CLEARANCES!

A minimum 1” air clearance must be maintained at the back and sides of the fireplace assembly.

Chimney sections at any level require a 2” minimum air space clearance between the framing and chimney section.

WARNING!

2"

Position mantel

 

60” from base of

 

the fireplace

43-7/8"

 

24"

42"

 

Figure 10A- Framing the Fireplace

Do not apply combustible finishing materials over any part of the front of this fireplace or a structure fire may result. The metal fireplace face may only be covered with noncombustible materials such as ceramic tile, brick, or stone. Do not cover or block any cooling air slots.

3. Electrical Access and Wiring Diagram

NOTE: The manual override switch, rheostat speed control and cover plate are supplied. You will need to supply: 14-3 wire with ground; 14-2 wire with ground; standard wall mount junction box; wire nuts.

1.Remove outside air cover plate on the bottom right side of the fireplace.

2.Thread the 14-3 with ground wire through the opening with the strain relief on the cover plate.

3.Match colors to wire harness, (red to red, white to white, etc) and secure with wire nuts.

NOTE: Wiring for blowers must be done before framed enclosure is completed. If using a Heat Zone kit, it also must be installed before enclosure is complete.

Match colors to wire harness (red to red, white to white, etc) and secure with a wire nut

Standard wall mount with

Junction Box

14-2 w/ground

14-3 w/ground

WIRE NUT

WHITEWHITE

 

GREEN

RED

BLACK

 

BLACK

 

Figure 10B- Fan Wiring Diagram

F. CHIMNEY REQUIREMENTS

When planning your fireplace location, the chimney construction and necessary clearances must be considered. The fireplace system and chimney components have been tested to provide flexibility in construction. The following figures are the minimum distances from the base of the fireplace.

1.

Min overall straight height

13 ft.

5.

Maximum distance between chimney stabilizers

35 ft.

2.

Min height with offset/return

14.5 ft.

6.

Double offset/return minimum height

20 ft.

3.

Max height

50 ft.

7.

Maximum unsupported chimney length between the offset and return

6 ft.

4.

Max chimney length between

12 ft.

8.

Maximum straight unsupported chimney height above the fireplace

35 ft.

 

an offset and return

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

480-1081

10

4-03

Image 10
Contents Kensington Blvd Installation & Operating InstructionsHearth & Home Technologies Lakeville, MNTable of Contents Safety PrecautionsFireplace system consists of the following Listings and Code ApprovalsDescription of the Fireplace System Required Components IncludeInstallation and Draft Considerations Outside AIR KIT InstallationHearth Extension / Floor Protection Fireplace and Hearth Extension are flush on the floorChimney Components Catalog No DescriptionCatalog No 27-3/815-3/4 PRE-INSTALLATION Preparation Fireplace Locations and Space RequirementsChimney Requirements Electrical Access and Wiring DiagramFraming the Fireplace Using Offsets and Returns Offset ChartChimney Height Requirements above roof line Dimensions reflect effective heightNumber of Sections Required Placing the Protective Metal Hearth Strips Installation of FireplacePositioning the Fireplace Leveling the FireplaceInstalling the Firestop Spacer Installing Firestop SpacersDouble-checking the Chimney Assembly Installing an Attic Insulation ShieldMobile home installation SL-300 Series MH842 Celing/Roof ThimbleMarking the Exit Point of the Roof SL-300 MH842 Celing/Roof Thimble Cont’dSecuring the Chimney System Cutting out the Hole in the RoofCompletion of the Enclosure Installing the Roof FlashingHearth Extension Alternate materials worksheet Position the Hearth ExtensionMantel Constructing a ChaseFinishing Material MaterialsChase Top Termination CapGeneral Information Outside Air Automatic Combustion Control Burning ProcessAir Control Kindling or 1st stageHeat Zone Operating Instructions Burning GuidelinesFan Operating Instructions BTU / Hr Slide ControlBurn Rates Starting a FireOpacity Wood Fuel Hardwood vs. Softwood Moisture contentSeasoning Draft Problems Storing WoodMaintenance Instructions Care and Cleaning of Glass Glass Replacement Care and Cleaning of Plated SurfacesFirebrick Replacement Brick PatternFan Replacement Fan Cord LocationBaffle Removal & Installation Door & Door GasketDoor Assembly Fascia Assembly Exploded ViewService Parts List Index Lifetime Warranty Please Return