14.Installing the Roof Flashing

If a roof flashing is to be used, install the roof flashing appropriate to the roof pitch and install a round termination cap following the instructions shipped with the cap.

For chase installations you can use a round termination cap (TR344), a round telescoping termination cap (TR342) or a square termination cap (ST375). A chase installation must use a chase top. Chase tops are available from your dealer. See page 19 for building a chase.

15.Completion of the Enclosure

Complete the fireplace enclosure, allowing space for outside air ducts. Electrical wiring should not come in contact with the fireplace. A minimum clearance of 1” must be maintained between the fireplace sides and back and the enclosure. See pages 9-10 for framing details.

16.Hearth Extension

A hearth extension must be installed with all fireplaces to protect the combustible floor in front of the fireplace from both radiant heat and sparks.

The construction of, and materials used for a hearth extension are shown in Figures 17A and 17B. A hearth extension of this construction may be covered with any noncombustible decorative material and may have a maximum thickness as per the illustration. Seal gaps between the hearth extension and the front of the fireplace with a bead of noncombustible sealant.

CLEARANCES!

A minimum 1” air clearance must be maintained at the back and sides of the fireplace assembly.

Chimney sections at any level require a 2” minimum air space clearance between the framing and chimney section.

NOTE: Use only a noncombustible material to finish the face of the fireplace below the level of the front standoffs. A noncombustible material such as USG MICORE CV230 Mineral Fiber Board, or USG DUROCK Cement Board is recommended for this purpose.

8" from each side of fuel loading door

20"41"

Figure 17A-Field Construction Hearth Extensions

1. Hearth Extension & Floor Protection flush on the floor.

Combustible flooring 20” in front of and 8” to either side of the fuel opening; must be insulated with non-combustible floor protection with a minimum thickness of 1” (“k” value = 0.43). Use Alternate Material Worksheet on page 18 to determine the “k” value of the alternative material..

2. Fireplace is flush on the floor and Hearth Extension is raised to the bottom of the fascia:

Raised hearth must be constructed of non-combustible materials such as cement block or equivalent material Decorative combustible flooring on the raised hearth must be 20” (508mm) in front of and 8” (203mm) to either side of the fuel opening must be insulated with non-combustible floor protection with a minimum thickness of 1-1/2” (38mm) and (“k” value = 0.43).

3. Fireplace is recessed in the floor to the bottom of the fascia:

Combustible flooring 30” (762mm) in front of and 8” (203mm) to either side of the fuel opening; must be insulated with non-combustible floor protection with a minimum thickness of 1” (25mm) and (“k” value = 0.43).

NONCOMBUSTIBLE

GAP (SEAL WITH NONCOMBUSTIBLE SEALANT)

DECORATIVE MATERIAL

 

 

 

 

 

 

 

1" (51mm)

(2)HX4 MICORE FACTORY BUILT HEARTH EXTENSION (Each HX4 = 1/2" (13mm) thick)

UP TO BOTTOM OF FASCIA

6" (152mm)

HEARTH METAL STRIPS

Figure 17B - Factory Built Hearth Extension

4-03

17

480-1081

Image 17
Contents Hearth & Home Technologies Installation & Operating InstructionsKensington Blvd Lakeville, MNSafety Precautions Table of ContentsDescription of the Fireplace System Listings and Code ApprovalsFireplace system consists of the following Required Components IncludeOutside AIR KIT Installation Installation and Draft ConsiderationsFireplace and Hearth Extension are flush on the floor Hearth Extension / Floor ProtectionCatalog No Description Chimney Components27-3/8 Catalog No15-3/4 Fireplace Locations and Space Requirements PRE-INSTALLATION PreparationFraming the Fireplace Electrical Access and Wiring DiagramChimney Requirements Offset Chart Using Offsets and ReturnsNumber of Sections Required Dimensions reflect effective heightChimney Height Requirements above roof line Positioning the Fireplace Installation of FireplacePlacing the Protective Metal Hearth Strips Leveling the FireplaceDouble-checking the Chimney Assembly Installing Firestop SpacersInstalling the Firestop Spacer Installing an Attic Insulation ShieldSL-300 Series MH842 Celing/Roof Thimble Mobile home installationSecuring the Chimney System SL-300 MH842 Celing/Roof Thimble Cont’dMarking the Exit Point of the Roof Cutting out the Hole in the RoofHearth Extension Installing the Roof FlashingCompletion of the Enclosure Position the Hearth Extension Alternate materials worksheetFinishing Material Constructing a ChaseMantel MaterialsTermination Cap Chase TopGeneral Information Outside Air Air Control Burning ProcessAutomatic Combustion Control Kindling or 1st stageFan Operating Instructions Burning GuidelinesHeat Zone Operating Instructions BTU / Hr Slide ControlOpacity Starting a FireBurn Rates Seasoning Moisture contentWood Fuel Hardwood vs. Softwood Storing Wood Draft ProblemsMaintenance Instructions Care and Cleaning of Plated Surfaces Care and Cleaning of Glass Glass ReplacementBrick Pattern Firebrick ReplacementFan Cord Location Fan ReplacementDoor & Door Gasket Baffle Removal & InstallationExploded View Door Assembly Fascia AssemblyService Parts List Index Lifetime Warranty Please Return