Hearth and Home Technologies BIR50 operating instructions Mobile home installation

Page 15

North Star

EPA Certified Fireplace

8. Mobile home installation

You must use the outside air termnination cap supplied with your North Star Fireplace for installation in a mobile home. If you use an alternative material it must be designed to prevent material from dropping into the area beneath the mobile home, and to prevent rodents from enterting from the outside.

1.An outside air inlet must be provided for combustion and must remain clear of leaves, debris, ice and/or snow. It must be unrestricted while unit is in use to prevent room air starvation which can cause smoke spillage and an inability to maintain a fire. Smoke spillage can also set off smoke alarms.

2.The fireplace is to be secured to the mobile home structure. Use same holes that attached the fireplace to the pallet to secure it to the floor use 1/4” x 2” lag bolts or equivalent.

3.Unit must be grounded with #8 solid copper grounding wire or equivalent and terminated at each end with N.E.C. approved grounding device.

4.Refer to Minimum Clearances to Combustibles on page 5 and chimney components on pages 6-8.

5.Floor protections requirements on page 17 must be followed precisely.

6.Use silicone to create an effective vapor barrier at the location where the chimney or other component penetrates to the exterior of the structure.

7.Follow the chimney and chimney connector manufacturer’s instructions when installing the flue system for use in a mobile home.

NOTE: Top sections of chimney must be removable to allow maximum clearance of 13.5’ (411cm) from ground level for transportation purposes.

8.Burn wood only. Other types of fuels may generate poisonous gases (e.g., carbon monoxide).

WARNING!

NEVER DRAW COMBUSTION AIR FROM A WALL, FLOOR OR CEILING CAVITY OR FROM ANY ENCLOSED SPACE SUCH AS AN ATTIC OR GARAGE.

WARNING!

DO NOT INSTALL IN SLEEPING ROOM.

CAUTION:

The structural integrity of the mobile home floor, wall and ceiling/roof must be maintaned. (i.e., Do not cut through floor joist, wall stud, ceiling truss, etc.)

9.SL-300 Series MH842 Celing/Roof Thimble

1.Locate the point where the chimney will exit the roof by plumbing down to the center of the chimney. Lay out, cut and frame a 14-1/2” square opening (measured on the horizontal) through the ceiling and roof structure. See Chapter 25 of the

Uniform Building Code for Framing Details.

2.The thimble must extend completely through the roof structure shielding combustible materials. Five location holes have been provided to allow for a variety of ceiling/roof thicknesses. The MH841 Thimble Extension is required when the ceiling/roof thickness exceeds 12-1/2”. The extension should overlap the thimble one inch.

3.To attach the extension to the thimble, drill 1/8” holes through the outer shield of the thimble using the predrilled holes in the extension as guides. Attach the extension to the thimble using the screws provided with the extension.

4.Install the thimble assembly and nail it securely to the framing members.

5.Center the flashing over the chimney and nail it to the roof using the Stormguard nails provided. Keep gaps between the flashing plate and the roof to a minimum.

6.Caulk the flashing plate and roof junction as well as the vertical seam on the flashing. All nail heads must be caulked with a roofing sealant.

7.Finish assembling the chimney storm collar and termination cap following the installation instructions provided with them.

 

CHIMNEY

FLASHING

FLASHING

PLATE

JOISTS

NAIL

THIMBLE

Figure 15A - Installing an MH842, Configuration 1

 

CHIMNEY

 

FLASHING

FLASHING

PLATE

 

THIMBLE

 

EXTENSION

 

SCREW

 

NAIL

 

THIMBLE

Figure 15A - Installing an MH842, Configuration 2

4-03

15

480-1081

Image 15
Contents Lakeville, MN Installation & Operating InstructionsHearth & Home Technologies Kensington BlvdSafety Precautions Table of ContentsRequired Components Include Listings and Code ApprovalsDescription of the Fireplace System Fireplace system consists of the followingOutside AIR KIT Installation Installation and Draft ConsiderationsFireplace and Hearth Extension are flush on the floor Hearth Extension / Floor ProtectionCatalog No Description Chimney Components27-3/8 Catalog No15-3/4 Fireplace Locations and Space Requirements PRE-INSTALLATION PreparationElectrical Access and Wiring Diagram Chimney RequirementsFraming the Fireplace Offset Chart Using Offsets and ReturnsDimensions reflect effective height Chimney Height Requirements above roof lineNumber of Sections Required Leveling the Fireplace Installation of FireplacePositioning the Fireplace Placing the Protective Metal Hearth StripsInstalling an Attic Insulation Shield Installing Firestop SpacersDouble-checking the Chimney Assembly Installing the Firestop SpacerSL-300 Series MH842 Celing/Roof Thimble Mobile home installationCutting out the Hole in the Roof SL-300 MH842 Celing/Roof Thimble Cont’dSecuring the Chimney System Marking the Exit Point of the RoofInstalling the Roof Flashing Completion of the EnclosureHearth Extension Position the Hearth Extension Alternate materials worksheetMaterials Constructing a ChaseFinishing Material MantelTermination Cap Chase TopGeneral Information Outside Air Kindling or 1st stage Burning ProcessAir Control Automatic Combustion ControlBTU / Hr Slide Control Burning GuidelinesFan Operating Instructions Heat Zone Operating InstructionsStarting a Fire Burn RatesOpacity Moisture content Wood Fuel Hardwood vs. SoftwoodSeasoning Storing Wood Draft ProblemsMaintenance Instructions Care and Cleaning of Plated Surfaces Care and Cleaning of Glass Glass ReplacementBrick Pattern Firebrick ReplacementFan Cord Location Fan ReplacementDoor & Door Gasket Baffle Removal & InstallationExploded View Door Assembly Fascia AssemblyService Parts List Index Lifetime Warranty Please Return