Desa (V)K42P SERIES installation manual Installation Planning, Horizontal Termination Installation

Page 8

8

VENTING INSTALLATION INSTRUCTIONS

Installation Planning

VENTING INSTALLATION INSTRUCTIONS

Continued

INSTALLATION PLANNING

There are two basic types of direct-vent installation:

Horizontal Termination

Vertical Termination

Horizontal Termination Installation

IMPORTANT: Horizontal square terminations require only inner portion of wall firestop. Horizontal installations using round termi- nation require exterior portion of wall firestop.

1.Set the fireplace in its desired location and determine the route your horizontal venting will take. Do not secure the fireplace until all venting has been installed. Some installations require sliding the fireplace in and out of position to make final venting connections. Figures 14 through 18 on pages 10 through 12 show different configurations for venting with horizontal termination that will help you decide which application best suits your in- stallation. Check to see if wall studs or roof rafters are in the path of your desired venting route. If they are, you may want to adjust the location of the fireplace.

2.Direct vent pipe sections and components are designed with special twist-lock connections.

Twist-Lock Procedure: The female ends of the pipes have locking lugs (indentations). These lugs will slide straight into matching slots on the male ends of adjacent pipes. Push pipe sections together and twist one section clockwise approxi- mately one-quarter turn until the sections are fully locked (see Figure 8). Note: Horizontal runs of vent must be sup- ported every three feet. Use wall straps for this purpose.

3.Use a 45° elbow to connect venting system to fireplace flue col- lar. The elbow is designed to be twist-locked onto the flue collar as described in step 2. IMPORTANT: Do not attempt to alter the configuration of the elbow by cutting, twisting, bending, etc.

4.Assemble the desired combination of pipe and elbows to the fireplace flue collar. If there are long portions of venting run, pre-assembled pipe sections may be installed as subassemblies for convenience.

5.Carefully determine the location where the vent pipe assembly will penetrate the outside wall. The center of the hole should line up with the center-line of the horizontal vent pipe. Mark the wall for a 10 3/4" x 10 3/4" square hole. Cut and frame the square hole in the exterior wall where the vent will be terminated. If the wall being penetrated is constructed of noncombustible material, such as masonry block or concrete, a 8 1/2" hole with zero clearance is acceptable (see Figure 9).

Female

Locking Lugs

Male

Slots

Figure 8 - Vent Pipe Connections

Vent Opening

 

Combustible Wall

10 3/4" Inside Framing

10 3/4"

(273mm)

(273mm)

 

10 3/4"

 

(273mm)

 

(Framing

Vent Opening

Detail)

 

Noncombustible Wall

 

8 1/2"

 

(216mm)

 

 

Center

 

of Hole

Figure 9 - Vent Opening Requirements

For..com

111921-01D

Image 8
Contents For Your Safety What to do if YOU Smell GAS OWNER’S Operation Installation ManualFor Your Safety Table of Contents Safety InformationProduct Identification Local CodesLocation and Space Requirements Product FeaturesPRE-INSTALLATION Preparation Clearances Framing and FinishingLocation of Termination CAP Balcony with Perpendicular Side WallVenting Installation Instructions Installation PrecautionsInstallation Planning Horizontal Termination InstallationInstalling Horizontal Vent Cap Noncombustible Exterior Horizontal Termination Configurations Horizontal HCorner Installation Horizontal System Installation Using TWO Elbows Venting with Two 90 ElbowsInstallation for Vertical Termination Flat Ceiling InstallationVertical Termination Configurations Venting with One 90 ElbowNumber Description High Altitude InstallationVertical Venting Fireplace Installation Installing Optional Blower AccessoriesModel BK Installation Check GAS TypeModel BKT Installation Blower Model BKTInstallation Items Needed Installing GAS Piping to Fireplace LocationBlower Wiring Diagram Connecting Fireplace to GAS Supply Installation Items NeededPressure Testing Gas Supply Piping System Checking GAS ConnectionsInstalling Optional Wall Mount Switch GWMS2 Pressure Testing Fireplace Gas ConnectionsRemoving Louver Panels Installing Remote ReceiverREMOVING/REPLACING Glass Door Removing Glass Doors Installing Brick Liner Models BL42DASA and BL42DHASACleaning Glass Door Installing LOGS, Lava Rock and Glowing Embers Crossover log onto logs #4 and #5 as shown in FigureFor Your Safety Read Before Lighting Manual Lighting ProcedureOperating Fireplace Lighting InstructionsON/OFF Series Models Ghrcb Optional HAND-HELD Remote OperationThermostat Series Models Ghrctb Operating Optional Blower Accessory Pilot AssemblyInspecting Burners Operating Optional GWMT1 Wall Mounted ThermostatCleaning Maintenance Glass DoorPilot and Burners LogsTroubleshooting Observed Problem Possible CauseObserved Problem Possible Cause Remedy Gas leak. See Warning statement AboveReplacement Parts Service HintsTechnical Service SpecificationsIllustrated Parts Breakdown ModelsParts List KEY Part Number Description QTYBurner Assembly for Models VK42N, VK42NH, VK42P, VK42PH Parts List Accessories Owners Registration Form For Com 111921-01D Warranty Information