Desa (v)V42EP SERIES Snorkel Termination Installation, Venting with Two 90 Elbows

Page 11
Snorkel Termination

Venting Installation instructions

Continued

SNORKEL TERMINATION INSTALLATION

Recommended Applications:

Installations requiring a vertical rise on building exterior

Any installation using snorkel termination to achieve one foot above ground

Snorkel terminations are available for installations requiring a vertical rise on the exterior of the building. If installing snorkel termina- tion below grade, you must provide proper drainage to prevent water from entering snorkel termination (see Figure 16). Do not back fill around snorkel termination.

Snorkel

Termination

12"

Minimum

Snorkel

 

Wall

Termination

 

 

Firestop

 

90° Elbow

 

 

12"

Minimum 45° Elbow

Adequate

Drainage

12"

Minimum

Figure 16 - Snorkel Termination Configurations for Below Ground Installation

HORIZONTAL SYSTEM INSTALLATION USING TWO 90° ELBOWS

The following configurations show the minimum vertical rise requirements for a horizontal system using two 90° elbows.

Venting with Two 90° Elbows

Vertical (V)

Horizontal

Horizontal (H1) +

 

(H1)

Horizontal (H2)

5' min.

2' max.

6' max.

6' min.

4' max.

12' max.

7' min.

6' max.

18' max.

8' min.

8' max.

20' max.

20' max.

8' max.

20' max.

45° Elbow

Venting with Two 90° Elbows

Vertical (V) Horizontal (H1)

 

Horizontal (H2) 45° Elbow

5' min.

6' max.

6' min.

12' max.

7' min.

18' max.

8' min.

20' max.

20' max.

20' max.

Figure 18 - Horizontal Termination Configuration for Venting Using Two 90° Elbows with Termination at 90° with Fireplace

Figure 17 - Horizontal Termination Configuration for Venting

Using Two 90° Elbows

108862-01E

www.desatech.com

11

Image 11
Contents What to do if YOU Smell GAS For Your SafetySafety Information Table of ContentsLocal Codes Product FeaturesProduct Identification Clearances Pre-Installation PreparationLocation and space requirements Framing and finishing Framing Clearances for Installation Against an Exterior WallTermination CAP AIR Supply Inlet GAS Meter Location of Termination CapHorizontal Termination Installation Venting Installation InstructionsInstallation Precautions Installation PlanningVent Pipe Connections Slide the wall firestop over the vent pipe before connecting Square Termination Vertical Horizontal Termination ConfigurationsVenting with Two 90 Elbows Snorkel Termination InstallationFlat Ceiling Installation Installation for vertical terminationVertical Venting Vertical Termination ConfigurationsInstalling optional blower accessories Fireplace InstallationHigh Altitude Installation Parts lists for venting kits and componentsBlower Model BK Model BKT InstallationInstallation Items Needed Installing Gas Piping to Fireplace LocationBlower Wiring Diagram Installation Items Needed Connecting Fireplace to GAS SupplyTest Pressures In Excess Of 1/2 Psig 3.5 kPa Pressure Testing Gas Supply Piping SystemPressure Testing Fireplace Gas Connections Checking GAS ConnectionsRemoving Louver Panels Cleaning Glass DoorUnplug fireplace. Let cool before installing brick liner Removing/Replacing Glass DoorInstalling Rear Brick Panel Installing logs, lava rock and glowing embersOptional Remote control Installation model WRC Wall Switch InstallationLine Wiring DiagramTo Turn OFF GAS To Appliance For your safety read Before lightingOperating Fireplace Lighting InstructionsBurner Flame Pattern Operating optional Blower accessoryPilot assembly Inspecting BurnersLogs Cleaning MaintenanceGlass Door Pilot and burnersTo clean pilot. This can damage pilot unit TroubleshootingTop above Gas leak. See Warning statement atSpecifications Replacement PartsService Hints Technical ServiceAccessories Models VV36EN, VV36ENS, VV36ENH, VV36EP, VV36EPS and VV36EPH Illustrated Parts BreakdownParts List Illustrated parts breakdown Parts List Models VV42EN, VV42ENS, VV42ENH, VV42EP, VV42EPS and VV42EPH 25487 27253 Lava Rock/Bag Assembly Vent Label 325 12 11 Parts List Keep this Warrant Warranty Information