Desa (v)V42EP SERIES installation manual Vent Pipe Connections

Page 8

Venting Installation

instructions

Continued

2.Direct vent pipe sections and components are designed with special twist-lock connections.

Twist-Lock Procedure: The female ends of the pipes have locking lugs (indentations). These lugs will slide straight into matching slots on the male ends of adjacent pipes. Push pipe sections together and twist one section clockwise approxi- mately one-quarter turn until the sections are fully locked (see Figure 8). Note: Horizontal runs of vent must be supported every three feet. Use wall straps for this purpose.

3.Use a 45° elbow to connect venting system to fireplace flue collar. The elbow is designed to be twist-locked onto the flue collar as described in step 2. IMPORTANT: Do not attempt to alter the configuration of the elbow by cutting, twisting, bending, etc.

4.Assemble the desired combination of pipe and elbows to the fireplace. If there are long portions of venting run, pre-as- sembled pipe sections may be installed as subassemblies for convenience.

5.Carefully determine the location where the vent pipe assembly will penetrate the outside wall. The center of the hole should line up with the center-line of the horizontal vent pipe. Mark the wall for a 10 3/4" x 10 3/4" square hole. Cut and frame the square hole in the exterior wall where the vent will be terminated. If the wall being penetrated is constructed of noncombustible material, such as masonry block or concrete, a 8 1/2" hole with zero clearance is acceptable (see Figure 9).

WARNING: Do not recess vent termination into any wall. This will cause a fire hazard.

6.Noncombustible Exterior Wall: Position the horizontal vent cap in the center of the 8 1/2" round hole and attach to the exterior wall with four wood screws provided. Before attach- ing the vent cap to exterior wall, run a bead of non-hardening mastic (pliable sealant) around the outside edges to make a seal between it and the outside wall. Note: The four wood screws provided should be replaced with appropriate fasteners for stucco, brick, concrete, or other types of sidings.

Combustible Exterior Wall: For vinyl siding, stucco, or wood exteriors, a siding standoff must be installed between the vent cap and exterior wall. The siding standoff prevents excessive heat from damaging the siding materials. Siding material must be cut to accommodate standoff. Bolt the vent cap to the standoff. Apply non-hardening mastic around outside edge of standoff. Position the standoff/cap assembly in the center of the 10 3/4" square hole and attach to exterior wall with wood screws provided (see Figure 11, page 9). The siding standoff must sit flush against the exterior fascia material.

Female

Locking Lugs

Male

Slots

Figure 8 - Vent Pipe Connections

Vent Opening

Combustible Wall

 

10 3/4" Inside Framin

 

 

 

10 3/4"

 

 

 

(27.3 cm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(27.3 cm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10 3/4"

 

(27.3 cm)

 

 

(Framing

Vent Opening

Detail)

 

Noncombustible Wall

 

8 1/2"

 

(21.6 cm)

Center

 

of Hole

Figure 9 - Vent Opening Requirements

Apply Mastic to

All Four Sides

Vent Cap

Wood Screw

Figure 10 - Installing Horizontal Vent Cap

www.desatech.com

108862-01E

Image 8
Contents For Your Safety What to do if YOU Smell GASTable of Contents Safety InformationLocal Codes Product FeaturesProduct Identification Clearances Pre-Installation PreparationLocation and space requirements Framing Clearances for Installation Against an Exterior Wall Framing and finishingLocation of Termination Cap Termination CAP AIR Supply Inlet GAS MeterVenting Installation Instructions Installation PrecautionsInstallation Planning Horizontal Termination InstallationVent Pipe Connections Slide the wall firestop over the vent pipe before connecting Horizontal Termination Configurations Square Termination VerticalSnorkel Termination Installation Venting with Two 90 ElbowsInstallation for vertical termination Flat Ceiling InstallationVertical Termination Configurations Vertical VentingFireplace Installation High Altitude InstallationParts lists for venting kits and components Installing optional blower accessoriesModel BKT Installation Blower Model BKInstallation Items Needed Installing Gas Piping to Fireplace LocationBlower Wiring Diagram Connecting Fireplace to GAS Supply Installation Items NeededPressure Testing Gas Supply Piping System Pressure Testing Fireplace Gas ConnectionsChecking GAS Connections Test Pressures In Excess Of 1/2 Psig 3.5 kPaCleaning Glass Door Unplug fireplace. Let cool before installing brick linerRemoving/Replacing Glass Door Removing Louver PanelsInstalling logs, lava rock and glowing embers Installing Rear Brick PanelWall Switch Installation Optional Remote control Installation model WRCWiring Diagram LineFor your safety read Before lighting Operating FireplaceLighting Instructions To Turn OFF GAS To ApplianceOperating optional Blower accessory Pilot assemblyInspecting Burners Burner Flame PatternCleaning Maintenance Glass DoorPilot and burners LogsTroubleshooting To clean pilot. This can damage pilot unitGas leak. See Warning statement at Top aboveReplacement Parts Service HintsTechnical Service SpecificationsAccessories Illustrated Parts Breakdown Models VV36EN, VV36ENS, VV36ENH, VV36EP, VV36EPS and VV36EPHParts List Illustrated parts breakdown Parts List Models VV42EN, VV42ENS, VV42ENH, VV42EP, VV42EPS and VV42EPH 25487 27253 Lava Rock/Bag Assembly Vent Label 325 12 11 Parts List Warranty Information Keep this Warrant