9
Burner ,Firebox and Control Knob
□Place firebox onto cart. Position the heat shield for tank as shown. Attach with
□Place the heat shield for UFC onto burner venturi tube, then insert burner / heat shield through venturi holes on firebox. Make sure ignitor wire go through th hole on heat shield and firebox as shown (B). Place burner assembly into firebox. Make sure venturi tubes and valves are correctly engaged. Place small end of venturi clip into venturi tube and large part of clip around valve (D). If burner is not leveled from left to right, adjust the two screws attaching valve to control panel in step 8.
□Inside firebox, attach firebox and control panel with 5x15 fiber washers and
□Attach ignitor wire to electrode (D).
□ Place control knobs on valves as shown (E). | Burner Assembly | Heat Shield F/UFC |
7x15 Fiber Washer
Wing Nut
B
A
Sheet Metal Screw
Qty.2
7x15 | 5x15 |
Fiber Washer | |
Fiber Washer | Qty.2 |
Qty.4 |
|
| C |
| |
Heat Shield F/Tank | Sheet Metal Screw |
|
|
| |
| Wing Nut |
| 7X15 |
Qty.4 | Venturi Clip | Fiber Washer | |
Carriage bolt |
| Qty.2 |
|
Qty.4 |
|
|
|
Correctly assembled valve in burner tube and venturi clips
E
D
Venturi Clip
Knob
Ignitor Wire
21