Weber 1200 owner manual Check contents of hardware packs

Page 9

Check contents of hardware packs

Three burner control knobs

Four tubing plugs (two are spares)

Two Swing table end brackets

Two hinge pins

(hardware size: 1/4 x 1 1/2 inch clevis pin) (actual size)

Five 1/4-20 x 2 inch bolts (actual size)

Six 1/4-20 x 1/2 inch bolts (actual size)

Two plastic buttons (actual size)

1/4-20 keps nut

Fifteen 1/4 inch nylon washers

Two hair pin cotters

Two wheel hubcaps

Two 10-24 hex nuts

Two 10-24 x 1 3/4 inch machine screws

Two Phillips screws/washers

9

Image 9
Contents Skyline LP GAS Units only MDANGER MWARNINGSWarranty Patents and Trademarks Contents Gas supply testing For Installation in CanadaGeneral Instructions StorageAssembly Check package contentsStep Two wheels Check contents of hardware packs Assemble frame Assemble wheelsContinue frame assembly Complete frame assemblyInsert casters Add cooking box Add front panelInstall manifold bracket Install igniter Install gas supplyGeneral Specifications for Piping Gas line piping Typical natural gas supply installation. FigureTest connections Check that all burner valves are offCheck for gas leaks MWARNING Do not ignite burners when leak checkingInstall the bottom tray Install Flavorizer Bars and Cooking GratesInstall the condiment basket Install LidAdd control panel and burner control knobs Install swing tableHinge rod Complete accessory installation To Extinguish LightingManual Lighting Cooking Periodic CleaningStorage and/or Nonuse Drippings and greaseAnnual Maintenance Inspection and Cleaning of the Weber Spider Stopper GuardsMWARNING Do not ignite burners while leak checking MCAUTION Do not enlarge the burner ports when cleaning General MaintenanceWeber Spider Stopper Guards Main Burner Flame PatternTo reinstall the burners, reverse steps c through g Crossover Ignition System Operations Burner does not light, or flame is low in High position Troubleshooting15-16 11,15 20-21 Parts List Final Word Thanks
Related manuals
Manual 36 pages 15.17 Kb