Pride Mobility 400 manual Manual Override Operation, Manual Overide Operation

Page 15

V . T R O U B L E S H O O T I N G

MANUAL OVERRIDE OPERATION

The lift system is equipped with a manual crank that serves as backup in the event of a power failure. Using the supplied tools, rotate the manual crank clockwise or counterclockwise to move the platform up or down. See figure 10.

1

2

3

4

3

 

 

 

1

4

 

 

2

 

 

 

 

 

 

OR

 

 

3

2

 

 

 

4

 

 

Figure 10. Manual Overide Operation

Commander 400

www.pridemobility.com

15

Image 15
Contents Commander F E T Y G U I D E L I N E S III N T E N T SInformation Exchange N T R O D U C T I O NInternet and Private Purchases PURCHASER’S Agreement Shipping and DeliveryS a F E T Y Product Safety SymbolsS a F E T Y PRE-LIFT Inspection InstallationLifting Capabilities Lifting NON-PRIDE ProductsI . Installation Lift System InstallationFollow these steps for installation Lift System BOOM-ARM AdjustmentTo raise or lower the upper post See figureTo raise or lower the boom arm Electrical Wiring InstallationI . Installation Lifting the Mobility Product Power Switch OperationO P E R a T I O N Hand Control OperationTo prevent dragging Lift will not Operate TroubleshootingTo reset the main circuit breaker To restore proper lifting strap travelManual Overide Operation Manual Override OperationPerform every 6 months Storage and Operation TemperaturesC a R E a N D M a I N T E N a N C E Perform prior to daily useExclusions also include components with damage caused by THREE-YEAR Transferable Limited WarrantyService Checks and Warranty Service I . W a R R a N T YT E S Page INFMANU4414