Pride Mobility 400 manual

Page 19
Image 19
Contents Commander F E T Y G U I D E L I N E S III N T E N T SInformation Exchange N T R O D U C T I O NInternet and Private Purchases PURCHASER’S Agreement Shipping and DeliveryS a F E T Y Product Safety SymbolsS a F E T Y PRE-LIFT Inspection InstallationLifting Capabilities Lifting NON-PRIDE ProductsLift System Installation I . InstallationFollow these steps for installation Lift System BOOM-ARM AdjustmentTo raise or lower the upper post See figureTo raise or lower the boom arm Electrical Wiring InstallationI . Installation Lifting the Mobility Product Power Switch OperationO P E R a T I O N Hand Control OperationTo prevent dragging Lift will not Operate TroubleshootingTo reset the main circuit breaker To restore proper lifting strap travelManual Overide Operation Manual Override OperationPerform every 6 months Storage and Operation TemperaturesC a R E a N D M a I N T E N a N C E Perform prior to daily useExclusions also include components with damage caused by THREE-YEAR Transferable Limited WarrantyService Checks and Warranty Service I . W a R R a N T YT E S Page INFMANU4414