Pride Mobility 400 manual INFMANU4414

Page 20

*INFMANU4414*

Image 20
Contents Commander F E T Y G U I D E L I N E S N T E N T S IIIN T R O D U C T I O N Internet and Private Purchases PURCHASER’S AgreementShipping and Delivery Information ExchangeProduct Safety Symbols S a F E T YS a F E T Y Installation Lifting CapabilitiesLifting NON-PRIDE Products PRE-LIFT InspectionFollow these steps for installation I . InstallationLift System Installation BOOM-ARM Adjustment To raise or lower the upper postSee figure Lift SystemElectrical Wiring Installation To raise or lower the boom armI . Installation Power Switch Operation O P E R a T I O NHand Control Operation Lifting the Mobility ProductTo prevent dragging Troubleshooting To reset the main circuit breakerTo restore proper lifting strap travel Lift will not OperateManual Override Operation Manual Overide OperationStorage and Operation Temperatures C a R E a N D M a I N T E N a N C EPerform prior to daily use Perform every 6 monthsTHREE-YEAR Transferable Limited Warranty Service Checks and Warranty ServiceI . W a R R a N T Y Exclusions also include components with damage caused byT E S Page INFMANU4414