Kohler K1191-LC, K-1191-RC, K1191-R manual Test Run the Bath

Page 10

Test Run the Bath (cont.)

Verify that the chromatherapy lights are operating. Upon start-up the lights should be changing through the color sequence. Press the light control switch (located directly across the bath from the power switch). The lights should stop sequencing and stay one color. Press the light control switch again and lights will deactivate.

Check the harness connections for leakage one more time.

Press the ″On/Off″ control switch again to turn off the unit. The switch will also turn off.

NOTE: For additional information on operation of your over¯owing bath, see ªUsing Your Bathº section.

1012493-2-A

10

Kohler Co.

Image 10
Contents Installation Guide Important Product Information Factory-Assembled FeaturesConnections and Service Access Product Notices Product InspectionTable of Contents Introduction Thank You For Choosing Kohler CompanyRecommended Tools and Materials Before You BeginList of New Terms PUMP/CONTROL Access Roughing In InformationConstruct the Stud Framing Install the Rough PlumbingPrepare the Unit Install the Plumbing Position the UnitTest Run the Bath Test the Control SwitchMake the Electrical Connections Check the Connections and Fill the UnitTest Run the Bath Clean-Up After Installation Install the Faucet TrimComplete the Finished Wall or Deck Fill the Bath Using Your BathOperating Sequence Chromatherapy Light Operation 1012493-2-A Kohler Co Kohler Co 1012493-2-A USA 1-800-4-KOHLER México Canada Kohler.com