6. Position the Unit

CAUTION: Risk of product damage. Do not lift or support the unit by the pump or piping. With help, carefully lift the unit into place.

Cut and discard the banding straps from the pump.

Insert the drain tailpiece into the trap.

7. Install the Plumbing

CAUTION: Risk of property damage. Ensure a watertight seal on the drain connections.

IMPORTANT! Choose a ®ll spout which will provide adequate air space above the bathing well rim of the unit. You may need to build up the deck material to obtain adequate air space because the outer rim may be lower than the bathing well rim. In addition, if you plan to install a deck-mounted, hand-held shower, the diverter vacuum breaker must maintain a minimum 1″ (2.5cm) air gap above the outer rim.

NOTE: An access panel must be installed for future maintenance.

If you have not yet done so, connect the drain to the trap according to the drain manufacturer's instructions.

Install the faucet valving according to the faucet manufacturer's instructions. Do not install the faucet trim until instructed.

Make sure all supply connections are tightened securely.

Open the hot and cold water supplies, and check the supply connections for leakage.

Run water into the bathing well, and check the drain connections for leakage.

1012493-2-A

8

Kohler Co.

Image 8
Contents Installation Guide Factory-Assembled Features Connections and Service AccessImportant Product Information Product Notices Product InspectionTable of Contents Thank You For Choosing Kohler Company Recommended Tools and MaterialsIntroduction Before You BeginList of New Terms PUMP/CONTROL Access Roughing In InformationPrepare the Unit Install the Rough PlumbingConstruct the Stud Framing Install the Plumbing Position the UnitTest the Control Switch Make the Electrical ConnectionsTest Run the Bath Check the Connections and Fill the UnitTest Run the Bath Complete the Finished Wall or Deck Install the Faucet TrimClean-Up After Installation Operating Sequence Using Your BathFill the Bath Chromatherapy Light Operation 1012493-2-A Kohler Co Kohler Co 1012493-2-A USA 1-800-4-KOHLER México Canada Kohler.com