Kohler K1191-L, K-1191-RC, K1191-R Complete the Finished Wall or Deck, Install the Faucet Trim

Page 11

Finished Deck

Material Silicone

Sealant

Bath

Access Panel

Framing

Water–Resistant

Wall Material

10. Complete the Finished Wall or Deck

NOTICE: Provide unrestricted service access to the pump, in-line heater, and control box. You must construct an access panel to provide sufficient clearance for servicing the pump, in-line heater, and control box.

Protect the product surface. Cover the framing with water-resistant wall material.

Keep the entire over¯ow channel area exposed to allow access to the drain over¯ow, and to permit easy cleaning of the over¯ow channel surfaces.

Seal the joints between the rim edge and the water-resistant wall or deck material with silicone sealant.

Tape and mud the water-resistant wall material.

Install the ®nished wall to the water-resistant wall material.

Seal the joints between the product rim and the ®nished wall material with silicone sealant.

11. Install the Faucet Trim

Install the faucet trim according to the instructions packed with the trim.

12. Clean-Up After Installation

When cleaning up after installation, do not use abrasive cleansers, as they may scratch and dull the bath surface. Use warm water and a liquid detergent to clean the surface.

Remove stubborn stains, paint, or tar with turpentine or paint thinner. Do not allow cleaners containing petroleum distillates to remain in contact with any bath surfaces for long periods of time. Remove plaster by carefully scraping with a wood edge. Do not use metal scrapers, wire brushes, or other metal tools. Use a powder-type detergent on a damp cloth to provide mild abrasive action to any residual plaster.

Kohler Co.

11

1012493-2-A

Image 11
Contents Installation Guide Product Notices Product Inspection Factory-Assembled FeaturesConnections and Service Access Important Product InformationTable of Contents Before You Begin Thank You For Choosing Kohler CompanyRecommended Tools and Materials IntroductionList of New Terms Roughing In Information PUMP/CONTROL AccessPrepare the Unit Install the Rough PlumbingConstruct the Stud Framing Position the Unit Install the PlumbingCheck the Connections and Fill the Unit Test the Control SwitchMake the Electrical Connections Test Run the BathTest Run the Bath Complete the Finished Wall or Deck Install the Faucet TrimClean-Up After Installation Operating Sequence Using Your BathFill the Bath Chromatherapy Light Operation 1012493-2-A Kohler Co Kohler Co 1012493-2-A USA 1-800-4-KOHLER México Canada Kohler.com