Kohler K-1191-RC, K1191-R, K1191-LC manual Table of Contents

Page 3

Important Product Information (cont.)

Electrical Requirements

The installation must have a Class A Ground-Fault Circuit-Interrupter (GFCI). The GFCI protects against line-to-ground shock hazard. Use a 240V, 15A, 60 Hz dedicated service.

An equipment grounding terminal is provided in the ®eld wiring compartment. To reduce the risk of electrical shock, this terminal must be connected to the grounding means provided in the electrical supply panel with a conductor equivalent in size to the circuit conductors supplying this equipment.

Install this unit in accordance with the Canadian Electric code, Part I.

 

Table of Contents

 

Important Information

2

Important Product Information

2

Product Notices

2

Product Inspection

2

Factory-Assembled Features

2

Connections and Service Access

2

Electrical Requirements

3

Thank You For Choosing Kohler Company

4

Recommended Tools and Materials

4

Introduction

4

Before You Begin

4

List of New Terms

5

Roughing In Information

7

Construct the Stud Framing

7

Install the Rough Plumbing

7

Prepare the Unit

7

Position the Unit

8

Install the Plumbing

8

Make the Electrical Connections

9

Test Run the Bath

9

Check the Connections and Fill the Unit

9

Test the Control Switch

9

Complete the Finished Wall or Deck

11

Install the Faucet Trim

11

Clean-Up After Installation

11

Using Your Bath

12

Fill the Bath

12

Operating Sequence

12

Chromatherapy Light Operation

13

Kohler Co.

3

1012493-2-A

Image 3
Contents Installation Guide Product Notices Product Inspection Factory-Assembled FeaturesConnections and Service Access Important Product InformationTable of Contents Before You Begin Thank You For Choosing Kohler CompanyRecommended Tools and Materials IntroductionList of New Terms Roughing In Information PUMP/CONTROL AccessInstall the Rough Plumbing Construct the Stud FramingPrepare the Unit Position the Unit Install the PlumbingCheck the Connections and Fill the Unit Test the Control SwitchMake the Electrical Connections Test Run the BathTest Run the Bath Install the Faucet Trim Clean-Up After InstallationComplete the Finished Wall or Deck Using Your Bath Fill the BathOperating Sequence Chromatherapy Light Operation 1012493-2-A Kohler Co Kohler Co 1012493-2-A USA 1-800-4-KOHLER México Canada Kohler.com