Jacuzzi U961000 Inspection and Testing Visual Inspection, Bathtub Water and Operational Test

Page 10

English

Espree™ Bathtub Series

Inspection and Testing

Visual Inspection

XX Remove the bathtub from the shipping carton. Be careful not to scratch the surface of the bathtub on exposed staples. Remove the staples or fold them into the carton. Retain the carton until satisfactory inspection of the product has been made. Do not lift the bathtub by the plumbing at any time; handle by the shell only.

YY Inspect the shell and bathtub components. Should inspection reveal any damage or defect in the finish or visible damage to any components, do not install the bathtub. Damage or defect to the finish claimed after the bathtub is installed is excluded from the warranty. Jacuzzi Luxury Bath’s responsibility for shipping damage ceases upon delivery of the products in good order to the carrier.

ZZ Refer any claims for damage to the carrier. For definitions of warranty coverage and limitations, refer to the published warranty information packed with the product or in the back of this manual.

Bathtub Water and Operational Test

All bathtub units are factory tested for proper operation and watertight connections prior to shipping. However, the unit must be retested by the installer prior to installation. Jacuzzi Luxury Bath is not responsible for any defect that could have been discovered, repaired, or avoided by following this inspection and testing procedure:

XX Place the bathtub on a level surface, near appropriate electrical supply, water supply, and water drainage. A driveway is a suitable choice.

YY Seal the drain and overflow hole with tape or a stopper and fill the bathtub to the bottom of the overflow hole. ZZ Allow bathtub to stand for 5 minutes.

[[ Plug in motor/pump and turn unit on. Confirm that all features function as described in the Operation section of this manual. Do not install the bathtub if bathtub fails to operate as described.

\\ Visually inspect all joints for leaks. Do not install the bathtub if leaks are detected. ]] Return bathtub to box or otherwise protect from damage until time of installation.

Page 10

www.jacuzzi.com

Installation and Operation

Image 10
Contents Espree Bathtub Series English Contents English Product InformationSafety Instructions Read and Follow ALL INSTRUCTIONS. Save These InstructionsSafety Instructions Operational Safety Instructions Risk of hyperthermia and possible drowningOperational Safety Instructions Introduction English Optional Tile Flange KITUndermount Installation Options Typical Flange Mounting DetailInspection and Testing Visual Inspection Bathtub Water and Operational TestFraming and Support SubfloorElectrical Connections English Pump/MotorElectrical Connection 6060 w/Heater Initial Start-UpDrop-in Installation Drop-in Installation con’t ` `Wall Alcove Installation English Skirt Installation Bathtubs with an Integral SkirtEnglish Operation CleanupON/OFF Button Rapdheat Operation Whirlpool ControlPurging the Whirlpool System English MaintenanceSuction Cover/Strainer Maintenance Bathtub AdditivesTroubleshooting Procedures Problem Probable Causes RemedyBaths Without Integral SKIRT, 542BM Specifications Corner Right Hand and Left Hand Specifications CornerRoughing-In Reference Espree 6032 with SKIRT, RH Espree 6042 with SKIRT, RHEnglish Roughing-In Reference 14 xCut Outs English Authorized Service SPECIFICATION/SERIAL Number LabelJacuzzi Luxury Bath EnglishEspañol Responsibilities of Others