Espree™ Bathtub Series
Framing and Support
A Technical Specifications section has been included with in this manual. The Technical Specifications section will contain pertinent information regarding your Jacuzzi Luxury Bath product.
English
Frame out the space where the bathtub is to be located. The following should be taken into consideration when preparing the area:
Common Access Locations
•Dimensions provided on
•The floor structure beneath the bathtub must be able to support the total weight of the bathtub, water and bather.
•The unit must be supported from the bottom of the bathtub and not from the bathtub rim. For
•Ensure the rim will rest on a level surface.
•Per code, access must be provided to the motor/pump for your specific model. Primary and secondary service access locations are shown in the
It is the responsibility of the installer, building contractor, or owner to provide access for service. Jacuzzi is not responsible for any costs relating to obtaining access for repair. The owner shall bear such
Secondary
Access
18˝
(457mm)
12˝
(304mm)
Primary
Access 18˝
(457mm)
Motor/Pump
20˝
(508mm)
C
costs and, if appropriate, must seek recovery from the installer.
• |
Motor/Pump
B
A
Provide adequate ventilation for cooling and supply |
sufficient air for the motor/pump. Do not insulate |
36˝
(914mm)
24˝
| around the equipment. |
• | Your bathtub may have motor/pump parts that extend |
beyond the rim of the bathtub. Refer to the | |
| diagrams included in the warranty pack and |
| construction framing to correctly accommodate. |
(609mm)
A= Primary access
B= Acceptable alternative if access A is not possible
C= Secondary access for equipment (optional)
Left hand unit access is on the opposite side (mirror).
Subfloor
Prepare the subfloor for the drain and ensure that the area is level.
XX The drain/overflow of the bathtub extends below the bottom of the bathtub. Identify the drawing in the Technical Specifications Manual that corresponds with your bathtub.
YY Make appropriate cuts to the subfloor to accommodate the drain.
ZZ Jacuzzi’s
[[ If the subfloor is not level, you must level the entire surface prior to installing the bathtub. The materials used will insure that the bathtub is supported from the bottom. These materials include: leveling compound, mortar, plaster or minimal expansion structural foam (having a density of a minimum 5lbs/cubic foot). The bathtub must remain level in order for it to drain properly and must make contact with the leveling material. Both sides of a joint or splice of subfloor should be level to each other.
Installation and Operation | www.jacuzzi.com | Page 11 |