Jacuzzi U961000 manual Electrical Connection 6060 w/Heater, Initial Start-Up

Page 13

Espree™ Bathtub Series

Electrical Connection 6060 w/Heater

On the 6060 with integral skirt, one junction box has been provided for the pump/motor. The motor is bonded to the junction box at the factory. To access, remove skirt access panel.

A separate 120 VAVAC, 15 AMP dedicated circuit with GFCI protected outlet (commercially available) is required for heater and is to be installed in a junction box. The junction box is to be hard wired.

Follow the bonding instructions below:

XX With a #8 solid copper wire, bond the heater to the house electrical panel or approved local bond. A bonding lug is provided on the heater.

Initial Start-Up

XX Push the GFCI test button. The reset button should pop out.

YY Push this button in to reset. If the interrupter fails to operate in this manner, there is a ground current flowing or a device malfunction, indicating the possibility of electrical shock.

ZZ Turn off power and do not use the bath until the source of the problem has been identified and corrected.

6060 Corner Unit

Bonding

For Heater

For Pump/Motor

GFCI

 

Bonding to

 

 

 

 

 

 

 

Pump/Motor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

English

 

 

 

 

 

 

 

 

J-

Box

Power Cord

(Commercially Available)

 

 

GFCI

Bonding to

(Commercially Available)

RapidHeat™

Heater ON

Overheat

Protection

Press to Reset

J-Box

Power Cord

(Commercially Available)

Installation and Operation

www.jacuzzi.com

Page 13

Image 13
Contents Espree Bathtub Series English English Product Information ContentsRead and Follow ALL INSTRUCTIONS. Save These Instructions Safety InstructionsSafety Instructions Risk of hyperthermia and possible drowning Operational Safety InstructionsOperational Safety Instructions Optional Tile Flange KIT Introduction EnglishTypical Flange Mounting Detail Undermount Installation OptionsBathtub Water and Operational Test Inspection and Testing Visual InspectionSubfloor Framing and SupportPump/Motor Electrical Connections EnglishInitial Start-Up Electrical Connection 6060 w/HeaterDrop-in Installation ` ` Drop-in Installation con’tSkirt Installation Bathtubs with an Integral Skirt Wall Alcove Installation EnglishEnglish Operation CleanupON/OFF Button Whirlpool Control Rapdheat OperationSuction Cover/Strainer Maintenance English MaintenancePurging the Whirlpool System Bathtub AdditivesProblem Probable Causes Remedy Troubleshooting ProceduresBaths Without Integral SKIRT, 542BM Specifications Corner Specifications Corner Right Hand and Left HandEspree 6032 with SKIRT, RH Espree 6042 with SKIRT, RH Roughing-In Reference14 x English Roughing-In ReferenceCut Outs English SPECIFICATION/SERIAL Number Label Authorized ServiceJacuzzi Luxury Bath Responsibilities of Others EnglishEspañol