Delta TM-105312 manual Preventative Maintenance Checklist, Procedure Monthly Every Months

Page 21

Preventative Maintenance Checklist

Procedure

Monthly

Every

Every

 

 

3 Months

6 months

Inspect General Condition of cooling tower.

¨

 

 

 

 

 

 

Check Water Level in cold water basin.

¨

 

 

Adjust if needed.

 

 

 

 

 

 

 

Check float ball & Make-up Valve for

¨

 

 

proper operation.

 

 

 

 

 

 

 

Check Line Voltage, Motor Amperage,

¨

 

 

Water Pressure.

 

 

 

 

 

 

 

Clean Sump Strainers, if installed.

¨

 

 

 

 

 

 

Lubricate Motor Bearing, (if motor has

 

 

 

fittings for greasing. The majority of motors

 

¨

 

require no external greasing). Use Proper

 

 

Lubricants. Increase frequency, as necessary

 

 

 

depending on conditions of service.

 

 

 

 

 

 

 

Check for obstructed Water Flow Through

 

¨

 

Orifices. Clean and flush spray nozzles, as

 

 

 

required.

 

 

 

 

 

 

 

Check All Bolts which can cause unbalance

 

¨

 

and vibration and tighten specified torque.

 

 

 

 

 

 

 

Check Condition of Water for proper

 

 

 

treatment to prevent build-up of algae and

 

¨

 

solids concentration

 

 

 

 

 

 

 

Clean and flush Cold Water Sump

 

 

¨

 

 

 

 

20

Image 21
Contents Delta Cooling Towers, Inc Table of Contents Delta Cooling Towers Principle of Cooling TowersCooling Tower Terms and Definitions Safety General InformationWater Treatment Dimensions and Other Physical Data Approximate WeightsOn -Site Inspection Handling and Installation of Your TM Series Cooling TowerOffloading Lifting with craneInstalling Revised Anchoring Location, Piping and Connections Electrical Wiring of Fan Motor and AccessoriesPVC Solvent Cementing Instructions Operation and Maintenance of Your TM Series Cooling Tower Safety in Operation of the FanWater Distribution System Fan and Mechanical Drive System and Its Maintenance SafetyMotor Water Level in Tower Sump Tower Model # Operating level fromCold Weather Protection Cold Weather OperationSeparate Indoor Sump Electric Immersion HeaterPVC Distribution System PipingOperation at Sub-freezing Ambients Problem Possible Causes Corrective Actions Install an air bleed valve at highest point Motor Trouble Shooting Guide General TM Series Recommended Replacement Parts TM Series Optional AccessoriesProcedure Monthly Every Months Preventative Maintenance Checklist