Delta TM Series Cooling Tower, TM-105312 manual Revised

Page 8

The body section should then be lifted and carefully position to align the support post of the sump with the corresponding groove of the tower body. Note that the four corner posts are slightly higher than other post to ease installation alignment.

Set one end of the tower body onto the corner post at one end of the sump first. This can be accomplished by use of a rope tether attached to the lifting bar at one end of the housing. Continue setting and aligning support post along the sides of the tower moving from one end to the other. This step may require a couple installers to align multiple posts simultaneously. You may use a rubber mallet or blocking wood to aid aligning post.

IMPORTANT: Make sure that all posts are correctly seated into the pocket of the tower body.

For single cell units, the four corner sump posts should then be secured to the main housing with the

provided stainless steel angle brackets and hardware. On Multi-cell towers, the outermost four corner posts should be secured to the main housing with the provided stainless steel angle brackets and hardware.

Before installing PVC louver panels, verify that all post are correctly seated into the pockets of the tower body.

Install PVC louver panels between each support post. Panels are numbered and marked on top of each panel, and should be installed with corresponding numbered window opening. Insert bottom of panel into window opening and work your way up to the top. Panels should be mounted flush with inside top of louver opening inside tower and should direct incoming air downward. Secure panels with self-tapping screws provided.

Revised 1-8-2007

7

Image 8
Contents Delta Cooling Towers, Inc Table of Contents Cooling Tower Terms and Definitions Delta Cooling TowersPrinciple of Cooling Towers Water Treatment SafetyGeneral Information Approximate Weights Dimensions and Other Physical DataHandling and Installation of Your TM Series Cooling Tower On -Site InspectionOffloading Lifting with craneInstalling Revised Anchoring Electrical Wiring of Fan Motor and Accessories Location, Piping and ConnectionsPVC Solvent Cementing Instructions Water Distribution System Operation and Maintenance of Your TM Series Cooling TowerSafety in Operation of the Fan Motor Fan and Mechanical Drive System and Its MaintenanceSafety Tower Model # Operating level from Water Level in Tower SumpCold Weather Operation Cold Weather ProtectionSeparate Indoor Sump Electric Immersion HeaterOperation at Sub-freezing Ambients PVC Distribution SystemPiping Problem Possible Causes Corrective Actions Install an air bleed valve at highest point Motor Trouble Shooting Guide General TM Series Optional Accessories TM Series Recommended Replacement PartsPreventative Maintenance Checklist Procedure Monthly Every Months