Delta TM-105312, TM Series Cooling Tower manual Installing

Page 7

Store tower assembly as shipped until the time of installation, in a secure, level and debris free location at the job site.

CAUTION: For extended lifts, use duplicate rigging, fabric slings around body as shown, as an additional safety precaution.

Installing

The cooling tower should be assembled in place on the previously prepared foundation.

After re-checking the rigging, lift the sump section of each cell and secure properly to the foundation.

Attach the fiberglass sump box to the center support post using the hardware provided as shown.

Revised 1-8-2007

6

Image 7
Contents Delta Cooling Towers, Inc Table of Contents Principle of Cooling Towers Delta Cooling TowersCooling Tower Terms and Definitions General Information SafetyWater Treatment Dimensions and Other Physical Data Approximate WeightsLifting with crane Handling and Installation of Your TM Series Cooling TowerOn -Site Inspection OffloadingInstalling Revised Anchoring Location, Piping and Connections Electrical Wiring of Fan Motor and AccessoriesPVC Solvent Cementing Instructions Safety in Operation of the Fan Operation and Maintenance of Your TM Series Cooling TowerWater Distribution System Safety Fan and Mechanical Drive System and Its MaintenanceMotor Water Level in Tower Sump Tower Model # Operating level fromElectric Immersion Heater Cold Weather OperationCold Weather Protection Separate Indoor SumpPiping PVC Distribution SystemOperation at Sub-freezing Ambients Problem Possible Causes Corrective Actions Install an air bleed valve at highest point Motor Trouble Shooting Guide General TM Series Recommended Replacement Parts TM Series Optional AccessoriesProcedure Monthly Every Months Preventative Maintenance Checklist