Store tower assembly as shipped until the time of installation, in a secure, level and debris free location at the job site.
CAUTION: For extended lifts, use duplicate rigging, fabric slings around body as shown, as an additional safety precaution.
Installing
The cooling tower should be assembled in place on the previously prepared foundation.
•After
•Attach the fiberglass sump box to the center support post using the hardware provided as shown.
Revised | 6 |