Braun NL955 manual Purpose Penetrating Oil

Page 47

 

Lift-Tite Latches

Maintenance and Lubrication

Parallel Arm

(Tower Pivot Points - 2)

Pivot Pins (8)

LO

 

 

LO

 

Lift-Tite Latch Dampening

 

 

Spring (2 springs - 4 Points)

Note: LPS2 General

 

 

LO

 

 

Purpose Penetrating Oil

 

 

Parallel Arm

 

 

is available in eleven

 

 

Pivot Pins (8)

ounce aerosol cans from

 

 

LO

 

 

The Braun Corporation

 

 

 

 

 

Switch Arm Pivot Pins (2)

(part number 15807).

 

 

 

 

 

LO

 

UHMW Bearing (4)

DE

Rotating Pivot

Slide Arm Pivot Pins

LO

Platform Fold Axles (2)

LO

Platform Pivot Pin (2 Points)

LO

Lift-Tite Latch Roller Assemblies (2)

LO

Side Entry Hinge

Pivot Points (4)

LO

Inboard Locator

Pivot Points

LO

Outer Barrier Latch LO

Outer Barrier

Latch Lever

LO

Outer Barrier Hinge

Pivot Points (2)

LO

Note: Clean lubrication points before applying lubricants.

Page 45

Image 47
Contents Operators Manual for Congratulations Contents Series No Pump Code Warranty and Registration InstructionsWarranty and Registration Instructions Illustration Lift TerminologyIntroduction Lift Components Vehicle and Lift Interlocks Deploy A-C Lift Actions and FunctionsSafety Symbols Safety FIRST! Know That Lift Operation SafetyLift Operation Safety Precautions Lift Operation Safety Stop powered wheelchairs with the wheelchair controls Lift Operation Safety Operation Notes and Details Control Switches Down Braun Corporation After- market Control Systems Policy Auxiliary Control SwitchesLift-TiteLatches NL955 Lift FeaturesDisengaged Fully-Deployed Fully-Unfolded Belt-operated Side Entry Outer Barrier Fully-Unfolded Ramp position Operation Notes and Details Operation Notes and Details Lift Passengers Wheelchair-Equipped Occupant Seat Belts Operation Procedure ReviewOperation Notes and Details Operation Notes and Details Lift Operating Instructions To Open Doors To Unload Passenger Lift Operating Instructions Facing outward and lock wheel- chair brakes To Load PassengerTo Fold Platform To Close Doors Nhtsa Operations Checklist Manual Operating Instructions Follow all Lift Operation Safety PrecautionsDown To Lower To Unfold Platform OutTo Fold Platform Up To RaiseDecals Decals and Antiskid30787 Available Antiskid AntiskidMaintenance and Lubrication DE Door-Ease Purpose Penetrating Oil 750 Cycles Maintenance and Lubrication Schedule1500 Cycles Maintenance and Lubrication Schedule 4500 Cycles 1500Maintenance and Lubrication Schedule Intervals 4500Consecutive CycleProviding Access to the World ManualOperators