Braun NL955 manual Maintenance and Lubrication Schedule

Page 52

Maintenance and Lubrication Schedule

continued

Perform all procedures listed in previous section also

4500

Cycles

Inspect parallel arms, bushings and pivot pins for visible wear or damage.

Inspect parallel arm pivot pin mounting bolts (8).

Inspect platform pivot pin, bushings and vertical arms for wear, damage and positive securement.

Inspect upper/lower fold arms, rotating pivot slide arms, slide support arms and associated pivot pins, bushings, and bearings for visible wear or damage.

Replace if needed.

Tighten or replace if needed.

Replace defective parts and resecure as needed. Apply Light Grease during reassembly proce- dures.

Replace if needed.

Inspect gas springs (cylinders) for wear or damage, proper operation and positive securement.

Inspect rotating pivot slide arm UHMW slide bear- ings (buttons).

Tighten, replace or correct as needed

Apply Door-Ease or replace if needed. See Lubri- cation Diagram.

Inspect vertical arm plastic covers.

Resecure or replace if needed.

Inspect power cable.

Resecure, repair or replace if needed.

Page 50

Image 52
Contents Operators Manual for Congratulations Contents Warranty and Registration Instructions Series No Pump CodeWarranty and Registration Instructions Lift Terminology IllustrationIntroduction Lift Components Vehicle and Lift Interlocks Lift Actions and Functions Deploy A-CLift Operation Safety Safety Symbols Safety FIRST! Know ThatLift Operation Safety Precautions Lift Operation Safety Stop powered wheelchairs with the wheelchair controls Lift Operation Safety Operation Notes and Details Control Switches Down Auxiliary Control Switches Braun Corporation After- market Control Systems PolicyLift Features Lift-TiteLatches NL955Disengaged Fully-Deployed Fully-Unfolded Belt-operated Side Entry Outer Barrier Fully-Unfolded Ramp position Operation Notes and Details Operation Notes and Details Lift Passengers Operation Procedure Review Wheelchair-Equipped Occupant Seat BeltsOperation Notes and Details Operation Notes and Details Lift Operating Instructions To Open Doors To Unload Passenger Lift Operating Instructions To Load Passenger Facing outward and lock wheel- chair brakesTo Fold Platform To Close Doors Nhtsa Operations Checklist Follow all Lift Operation Safety Precautions Manual Operating InstructionsTo Unfold Platform Out Down To LowerUp To Raise To Fold PlatformDecals and Antiskid Decals30787 Antiskid Available AntiskidMaintenance and Lubrication DE Door-Ease Purpose Penetrating Oil Maintenance and Lubrication Schedule 750 Cycles1500 Cycles Maintenance and Lubrication Schedule 1500 4500 CyclesMaintenance and Lubrication Schedule 4500 ConsecutiveCycle IntervalsProviding Access to the World ManualOperators