Braun NL955 manual Maintenance and Lubrication Schedule

Page 50

Maintenance and Lubrication Schedule

continued

Perform all procedures listed in previous section also

1500

Cycles

Inspect switch arm components for wear or dam- age, and for proper operation.

Inspect microswitches for securement and proper adjustment.

Make sure lift operates smoothly.

Inspect external snap rings/e-clips:

Rotating pivot slide arm pivot pins (2 per pin)

Rotating pivot slide arm roller axles (2 per pin)

Platform cylinder pivot pins (2 per pin)

Platform fold axles (1 per axle)

Inboard locator lever bracket pins (1 per pin)

Lift-Titelatch gas (dampening) spring (2 per spring)

Replace defective parts.

Resecure, replace or adjust as needed.

Realign towers and vertical arms. Lubricate or correct as needed.

Resecure or replace if needed.

Inspect platform fold axles and bearings for wear or damage and positive securement.

Inspect Side Entry for proper operation, positive securement and wear or damage to nylon belt and roller chain.

Replace defective parts and resecure as needed. Apply Light Oil.

Correct or replace defective parts.

Page 48

Image 50
Contents Operators Manual for Congratulations Contents Warranty and Registration Instructions Series No Pump CodeWarranty and Registration Instructions Lift Terminology IllustrationIntroduction Lift Components Vehicle and Lift Interlocks Lift Actions and Functions Deploy A-CLift Operation Safety Safety Symbols Safety FIRST! Know ThatLift Operation Safety Precautions Lift Operation Safety Stop powered wheelchairs with the wheelchair controls Lift Operation Safety Operation Notes and Details Control Switches Down Auxiliary Control Switches Braun Corporation After- market Control Systems PolicyLift Features Lift-TiteLatches NL955Disengaged Fully-Deployed Fully-Unfolded Belt-operated Side Entry Outer Barrier Fully-Unfolded Ramp position Operation Notes and Details Operation Notes and Details Lift Passengers Operation Procedure Review Wheelchair-Equipped Occupant Seat BeltsOperation Notes and Details Operation Notes and Details Lift Operating Instructions To Open Doors To Unload Passenger Lift Operating Instructions To Load Passenger Facing outward and lock wheel- chair brakesTo Fold Platform To Close Doors Nhtsa Operations Checklist Follow all Lift Operation Safety Precautions Manual Operating InstructionsTo Unfold Platform Out Down To LowerUp To Raise To Fold PlatformDecals and Antiskid Decals30787 Antiskid Available AntiskidMaintenance and Lubrication DE Door-Ease Purpose Penetrating Oil Maintenance and Lubrication Schedule 750 Cycles1500 Cycles Maintenance and Lubrication Schedule 1500 4500 CyclesMaintenance and Lubrication Schedule Cycle 4500Consecutive IntervalsProviding Access to the World ManualOperators