2.7 Connection of 2.4 GHz Portable Stations
4. Finish the site survey
Refer to "2.7.6 After Site Survey".
a.Return all DIP switches of each CS to the OFF position, and stop supplying power.
b.Turn off the PS.
5. Connect the CS and PS to the Hybrid
Refer to "2.7.7 Connecting a Cell Station to the Hybrid
a.Connect the CSs to the Hybrid
b.Register the PSs to the Hybrid
c.Walk around the service area while having a conversation using a registered PS. If noise is frequent or conversations disconnect, relocate the CSs or install an additional CS.
6. Mount the CS on the wall
Refer to "2.7.8 Wall Mounting".
a.If there are no problems in testing, mount the CS on the wall.
96