Haier HDU-42CF03/H Installation of air suction and discharging duct, Drainage Test, Procedures

Page 28

Installation Manual For Indoor Unit

(d)When constructing drain piping for several units, position the common pipe about 100 mm below the drain outlet of each unit as shown in the sketch. Use VP-30(11/4") or thicker pipe for this purpose.

(e)The stiff PVC pipe put indoor side should be heat insulated.

Secure the elevation as high as possible (approx. 100 mm)

A downhill grade of

VP 30

1/100 or more

 

(f)Avoid putting the outlet of drain hose in the places with irritant gas generated. Do not insert the drain hose directly into drainage, where the gas with sulfur may be generated.

(g)Backwater bend

Because the drain spout is at the position, which negative pressure may occur. So with the rise of water level in the drain pan, water leakage may occur. In order to prevent water leakage, we designed a backwater bend.

The structure of backwater bend should be able to be cleaned. As the below figure shown, use T type joint. The backwater bend is set near the air conditioner.

As figure shown, set a backwater bend in the middle of drain hose.

H1

H2

Drainage Test

H1=100mm or the static pressure of air sending motor H2=1/2H1 (or between 50~100mm)

1Conduct a drainage test after completion of the electrical work.

2During the trial, make sure that drain flows properly through the piping and that no water leaks from connections.

3 In case of a new building, conduct the test before it is furnished with the ceiling. 4 Be sure to conduct this test even when the unit is installed in the heating season.

Procedures

1Supply about 1000 cc of water to the unit through the air outlet using a feed water pump.

2Check the drain while cooling operation.

6.Installation of air suction and discharging duct

muffler cavity (air sending)

Enlarging chart of

 

 

 

Sacking joint

profile chart A

Insulation

A

Vibration resistance hook

Air volume adjuster

Air outlet

Air conditioner

Ceiling

main unit

Air suction grille with air filter

 

Checking meatus

Please consult the after-sales service worker of Haier Air Conditioner for the choosing and installation of suction inlet, suction duct, discharging outlet and discharging duct. Calculating the design drawing and outer static pressure, and choose the discharging duct with proper length and shape.

27

Image 28
Contents Duct Type AIR Conditioner Table of Contents Disposal of the old air conditioner Safety Precautions Make sure the system is groundedDo not wash the air conditioner with water Machine is adaptive in following situation Parts and Functions Buttons and display of the wire controller Parts and Functions OperationCool Fan operation Auto RUN, COOL,HEAT and DRY Timer operation Timer ON-OFF Cooling, dehumidifying mode Heating mode This series changeover switch is set 1. on 2.OFF 3.OFF 4.OFF Malfunction Unit fails to startCooling or heating is not sufficient Cooling is not sufficientMalfunction Followings are not malfunction Care and Maintenance Points to observeFor Preparation of HeatingHot Keep HOT KEEPis operated in the following casesIs The Unit Installed Correctly Installation placeWhen you change your address or the installation place For inspection and maintenanceInstallation Manual For Wire Controller Install wire controllerHint Wire sizeHint Installation Manual For Indoor Unit Safety precautions Choose installation place Height of ceilingPreparation before installation Hanger bolts installationInstallation of indoor unit Adjusting to the levelnessDrain Piping Good pipingProcedures Installation of air suction and discharging ductDrainage Test Chosen chart of simple duct Air volumeExamples of improper installation Rotate this switch Operation method of fan controllerRefrigerant pipe R0.4~0.8Installation Manual For Electric Wiring Wiring connectionHaier Group