Installation Procedure
(For series 142, 182 )
Check whether indoor unit is horizontal with leveler or polythene pipe filled with water , and check that the dimension of the ceiling opening is correct. Take off the lever gauge before install the ornament panel.
Fasten the screws to make the height difference between the two sides of indoor unit less than 5mm.
First fix it with screws temporally.
Fasten the two temporally fixing screws and other two, and tighten the four screws.
Connect the wires of
If no response of remote controller, |
|
check whether the wiring is correct, |
|
restart remote controller 10 seconds |
|
after shut off power supply. | Electric control box |
|
(For series 142, 182 )
POWER SUPPLY:
INDOOR UNIT | 1 | 2 | 3 |
|
|
|
|
| |||
|
|
|
|
| |||||||
|
|
|
|
| |||||||
|
|
|
|
|
|
|
|
|
|
| |
TERMINAL BLOCK |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
OUTDOOR UNIT | 1 | 2 | 3 |
|
|
|
|
| |||
|
|
|
|
| |||||||
|
|
|
|
| |||||||
TERMINAL BLOCK |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
L N
<Limits of panel board installation>
Install the panel board in the direction shown in the figure. The incorrect direction will result in water leakage, meanwhile swing and signal receiving are displayed that cannot be connected.
24