Matched Parts

Certain parts must be replaced in matched sets. Matched sets are required in the following areas:

Output diodes: D1, D2, D3, D4 and D5

Output diodes: D7, D8, D9, D10 and D11

Capacitor bleeder resistors: R1 and D9

Capacitors: C1 and C2

Capacitors: C1, C2, C14 and C15 (575 VAC only)

Switch PC Board Repairs

If a test indicates that a Switch PC Board is defective, both Switch PC Boards must be replaced. Replacement boards must have completely identical part numbers. A defective module is likely to damage other devices in the power circuitry. The defect may be subtle and not detectable by an ohmmeter mea- surement. Unknown defective parts may cause newly replaced parts to fail.

In addition to replacing the Switch PC Boards, replace C1 and C2 (also C14 and C15 of the 575 VAC V300- PRO) if the following conditions are met:

1.Machine was operating from 380 VAC or higher supply when failure occurred.

2.Switch PC Boards have burned areas.

Switch PC Board Replacement Procedure

WARNING

ELECTRIC SHOCK can kill.

Have an electrician install and service this equipment.

Turn the input power off at the fuse box before working on equipment.

Do not touch electrically hot parts.

---------------------------------------------------------------------

EXPLODING PARTS can cause injury.

Failed parts can explode or cause other parts to explode when power is applied.

Always wear a face shield and long sleeves when servicing.

----------------------------------------------------------------------------------

1.Carefully disconnect the leads at the top of the Switch PC Board.

2.Remove the four socket head cap screws with a 3/16” hex key wrench.

3.While holding the Switch PC Board, remove the hex head cap screws from the center area of the board.

4.Remove the board.

5.Thoroughly clean the heat sink surface.

6.Apply a thin layer (ideally .005-.010”) of Dow 340 Heat Sink Compound to the module mounting sur- faces of the new Switch PC Board and a thinner layer (.002”) to the capacitor terminals. Keep the heat sink compound away from the screw threads since this compound will affect the torque specifi- cations.

7.Carefully place the Switch PC Board onto the heat sink. Be sure the mounting holes are lined up before making full contact with the heat sink.

8.Caution: The heat sink and the capacitor terminals are relatively soft material and it is very easy to cross-thread the mounting screws. Holding the Switch PC Board, install the 4 socket head cap screws, finger tight only. Then install the hex head cap screws into the capacitor, finger tight only.

9.Torque the 4 socket head cap screws to 44 inch- lbs force (5 N - m). Then torque the capacitor hex head cap screws to 55 inch-lbs force (6 N - m).

10.Reconnect all the leads to the board.

Before applying input power to the machine, check all electrical connections. An incorrect connection will result in machine damage when the power is switched on.

Test After Repair

1.Short terminals 14 and 53 of the Protection PC Board. Connect an ohmmeter, set for X1000 range, to terminals 9 (+) and 12 (-) of the Switch PC Board. The meter will show the capacitors charging up. The meter may take a minute or so to stabilize. The value must not exceed 8600 ohms. Test both boards. For 575V only units - measure across each power capacitor, 2 per switch board; All four readings should be approximately 5,000 ohms.

2.If OK, remove the short and proceed with the power test.

3.Fuse input supply with 5 amp fuses.

4.Check output open circuit voltages. Do not apply output load.

5.Connect machine for 460 (V300-PRO), or 575 (V300-PRO, 575V), or 380, 415 or 440 (V300-I) VAC input.

6.Check output open circuit voltages. Do not apply output load.

7.Fuse for 20 amps and test under load.

20

Image 20
Contents INVERTECV300-PRO December,1999 Electric Shock can kill Electric and Magnetic Fields Précautions DE Sûreté Table of Contents Please Examine Carton and Equipment For Damage Immediately Product Description SpecificationsInstallation Single Phase Input Three Phase InputLN-25 Connection Instructions LN-7 Connection InstructionsK900-1 DC TIG Starter Connection Remote Control of InvertecParallel Operation Quick Disconnect Plugs LN-9 GMA Connection InstructionsOutput Cables OFF Mode SwitchOperating Instructions Output Terminals Switch Arc Force / Inductance ControlMaintenance Meter Polarity SwitchAuxiliary Power Capacitor Discharge ProcedurePeriodic Maintenance TroubleshootingTroubleshooting Guide Trouble What To DoTest Procedures Next Test Step Check Result Conclusion Repair ActionNext Test Next Step Test Conclusion Repair Action Check Result Next Step Test Test After Repair Switch PC Board Replacement ProcedureMatched Parts Replacement of Power Modules and Output Diodes Printed Circuit Board ReplacementComponent to Heat Sink Component Torque ±10%Remote Control Adapters P O W E R S O U R C EK867 Universal Adapter for 14-PIN Wire Feeder Receptacle Installation I N S T R U C T I O N SN T R O L P H E N O L R KP U T C a B L E E E N V E R T E C W E R S O U R C EP H E N O L R K A R E V E R T E C W E R S O U R C EM O T E O U T P U T C O N T R O L T U S E D O N I N V E R T E CN N E C T T O G E T H E R F O R L D I N G O U T P U T K876 Adapter to LN-25 Connection Diagram N T R O L C a B L EE C T R O D E C a B L E P H E N O LN D a M P T R O L X I L I a R Y P O W E R O T a M P T R O LK900-1 DC TIG Starter Connection Diagram R C HLN-9 GMA with K596 Cable to Invertec Connection Diagram E C T R O D E C a B L E Wiring Diagram V300-PRO Code 10256, V300-I Code + ARC ARCInvertec V300-PRO Invertec V300-PRO Invertec V300-PRO How To Read Shop Drawings $700.00Precaucion Warnung