I. Start-up Checklist

Inspect all components and accessories for damage before and after installation.

Check installation for compliance with all national and local codes and ordinances.

Read and follow all manufacturer's installation instructions.

Check that circuit breaker(s) and electrical wire sizes are correct. If the unit is supplied with a power supply cord, insure that it is stored properly.

Check the condensate water drain outlet(s) to make sure they are in compliance with all national and local codes, that they are adequate for the removal of condensate water, and that they meet the approval of the end user.

Strictly follow installation instructions concerning clearances around the unit.

Secure components and accessories, such as the control door and front cover.

Check the unit air fi lter, condenser coil and evaporator coil for any obstructions.

Check for proper operation of all components.

Instruct the owner or operator of the units operation, and the manufacturer's recommended routine maintenance schedule.

NOTE: It is highly recommended that a maintenance schedule log book be prepared for recording the dates and times of service.

Operate the unit for twenty minutes. Record the unit's indoor/outdoor intake and discharge temperatures, amperage draw, and power voltage.

Assemble the Warranty Certifi cate, the Operation and Installation Manual, all accessory installation instructions and the name, address and telephone number of the Authorized Friedrich Warranty Service Company in the area for the owner or operator.

NOTE: Units are to be installed, inspected, and checked by qualified service personnel only.

20

Image 20
Contents Ptac Standard Control Remote Thermostat Seacoast ProtectedTable of Contents Model Number Code Ptac Installation Recommendations Building ElevationFriedrich Digital Control Features DigitalTemperatureHeatPumpMode Internal Drain optional for new construction Installation Instructions PXDR10 Drain KitDrain Kit Location and Installation ExternalDrainfor new construction or unit replacement Drain Tube InstallationCover Plate Installation Drain Kit InstallationWall Sleeve Installation Instructions Pdxws TypicalWallSleeveInstallationDimensions LintelInstallationWall Sleeve Extension Sealant Locations Section II Deep Wall Installation PxweExtension Installation Installation Instructions Model Pxga Standard Grille Standard GrillePower Cord Information 230/208V models only Electrical Rating Tables15/20A Lcdi Device 30A Lcdi DeviceInstallation Checklist Section III Chassis InstallationWall sleeve Wall sleeve flange Chassis flange and gasket Digital Control User Input Configuration Dip Switch SettingFactory Dip Switch Configuration Digital Control Operation Control board with optional Pdxrt escutcheon kit installed Remote Thermostat and Low Voltage Control ConnectionsFresh Air Vent Control Air Discharge GrilleDesk Control Terminals Auxiliary Fan ControlStart-up Checklist Appendix a Electrical Wiring for 265 Volt Models Line Voltage ConnectionsRoutine Maintenance ComponentsBasic Troubleshooting Techniques Environmental Effects Cooling ModeEnvironmental Effects Heating Mode Insufficient Maintenance and InspectionTest Mode Digital Control Diagnostics and Test ModeDiagnostics Friedrich Ptac Accessories Pxdl Friedrich Air Conditioning Company 920-087-04