Friedrich 920-087-04 (3-05) manual Routine Maintenance, Components

Page 22

920-087-04 (3-05)

J. Routine Maintenance

NOTE: Units are to be inspected and serviced by qualified service personnel only.

1.Clean the unit air intake filter at least every 300 to 350 hours of operation. Clean the filters with a mild detergent in warm water and allow to dry thoroughly before reinstalling.

2.The indoor coil (evaporator coil), the outdoor coil (condenser coil) and base pan should be inspected periodically (yearly or bi-yearly) and cleaned of all debris (lint, dirt, leaves, paper, etc.). Clean the coils and base pan with a soft brush and compressed air or vacuum. If using a pressure washer, be careful not to bend the aluminium fin pack. Use a sweeping up and down motion in the direction of the vertical aluminum fin pack when pressure cleaning coils. Cover all electrical components to protect them from water or spray.

Before reinstalling the chassis in the sleeve, inspect the indoor blower housing, blower wheel, condenser fan blade, and condenser shroud periodically (yearly or bi-yearly) and clean of all debris (lint, dirt, mold, fungus, etc.) Clean the blower housing area and blower wheel with an antibacterial

/antifungal cleaner. Use a biodegradable cleaning agent and degreaser on condenser fan and condenser shroud. Use warm or cold water when rinsing these items. Allow the unit to dry thoroughly, inspect all gasket material for deterioration (replace as necessary), and then reinstall the chassis in the sleeve.

NOTE: Do not use a caustic coil cleaning agent on coils or base pan. Use a biodegradable cleaning agent and degreaser.

3.Periodically (at least yearly or bi-yearly): inspect all control components, both electrical and mechanical, as well as the power supply. Use proper testing instruments (voltmeter, ohmmeter, ammeter, wattmeter, etc.) to perform electrical tests. Use an air conditioning or refrigeration thermometer to check room, outdoor and coil operating temperatures. Use a sling psychrometer to measure wet bulb temperatures indoors and outdoors.

4.Inspect the surrounding area (inside and outside) to ensure that the units' clearances have not been compromised or altered.

5.Inspect the sleeve and drain system periodically (at least yearly or bi-yearly) and clean of all obstructions and debris. Clean both areas with an antibacterial and antifungal cleaner. Rinse both items thoroughly with water and ensure that the drain outlets are operating correctly. Check the sealant around the sleeve and reseal areas as needed.

6.Clean the front cover when needed. Use a mild detergent. Wash and rinse with warm water. Allow them to dry thoroughly before reinstalling them in the chassis.

Figure16

Components

 

Condenser Fan Blade

Condenser Gasket

Outdoor Grille

 

 

 

 

 

 

Indoor Blower

Condenser Shroud

 

 

 

 

 

Discharge Air Grille

 

 

Filters

Indoor Blower

 

 

 

Housing

 

 

 

 

Gasket

 

 

 

Compressor

Wall Sleeve

 

Front Cover

Basepan

 

 

 

Innerwall

 

Return Air

 

Control Panel

 

Grille

 

Evaporator Coil

 

22

Image 22
Contents Ptac Standard Control Remote Thermostat Seacoast ProtectedTable of Contents Model Number Code Ptac Installation Recommendations Building ElevationFriedrich Digital Control Features DigitalTemperatureHeatPumpMode Drain Kit Location and Installation Installation Instructions PXDR10 Drain KitInternal Drain optional for new construction Cover Plate Installation ExternalDrainfor new construction or unit replacementDrain Tube Installation Drain Kit InstallationWall Sleeve Installation Instructions Pdxws TypicalWallSleeveInstallationDimensions LintelInstallationExtension Installation Section II Deep Wall Installation PxweWall Sleeve Extension Sealant Locations Installation Instructions Model Pxga Standard Grille Standard Grille15/20A Lcdi Device Power Cord Information 230/208V models onlyElectrical Rating Tables 30A Lcdi DeviceInstallation Checklist Section III Chassis InstallationWall sleeve Wall sleeve flange Chassis flange and gasket Factory Dip Switch Configuration Dip Switch SettingDigital Control User Input Configuration Digital Control Operation Control board with optional Pdxrt escutcheon kit installed Remote Thermostat and Low Voltage Control ConnectionsDesk Control Terminals Fresh Air Vent ControlAir Discharge Grille Auxiliary Fan ControlStart-up Checklist Appendix a Electrical Wiring for 265 Volt Models Line Voltage ConnectionsRoutine Maintenance ComponentsEnvironmental Effects Heating Mode Basic Troubleshooting TechniquesEnvironmental Effects Cooling Mode Insufficient Maintenance and InspectionDiagnostics Digital Control Diagnostics and Test ModeTest Mode Friedrich Ptac Accessories Pxdl Friedrich Air Conditioning Company 920-087-04