Porter-Cable FTS-150 operating instructions Contents, Table DES Matières

Page 2

EVERY MACHINE IS THOROUGHLY TESTED BEFORE LEAVING THE FACTORY. EACH MACHINE IS SUPPLIED WITH A COPY OF THIS MANUAL. OPERATORS OF THIS EQUIPMENT MUST READ AND BE FAMILIAR WITH THE SAFETY WARNINGS. FAILURE TO OBEY WARNINGS MAY RESULT IN INJURY OR DEATH. FOLLOW INSTRUCTIONS STRICTLY TO ENSURE LONG SERVICE IN NORMAL OPERATION.

CONTENTS

 

 

Symbol Definitions

4 - 5

Decal Descriptions and Locations

6

 

Safety Warnings – DO’s & DO NOT’s

8 - 9

Instructions

 

 

1.

Features

10

 

2.

Benefits

10

 

3.

Machine Set-Up

10

- 14

4.

Operating Procedures

14

- 15

5.

Alignment Procedures ………………………………………………………………………………. 15

 

6.

Maintenance

15

 

7.

Trouble Shooting Guide………………………………………………………………………………16

 

8.

Repairs

16

 

9.

Spare Parts

16

 

10.

Accessory Use & Installation

17

 

Diagrams and Spare Parts

22

- 24

Warranty

25

 

CHAQUE MACHINE A ÉTÉ ENTIÈREMENT TESTÉE AVANT DE QUITTER L'USINE. CHAQUE MACHINE EST FOURNIE AVEC UN EXEMPLAIRE DE CE MANUEL. LES OPÉRATEURS DE CE MATÉRIEL DOIVENT LIRE LES CONSIGNES DE SÉCURITÉ ET BIEN LES CONNAÎTRE. L'INOBSERVATION DE CES CONSIGNES PEUT PROVOQUER DES BLESSURES OU LA MORT. SUIVRE STRICTEMENT LES INSTRUCTIONS POUR OBTENIR UNE LONGUE DURÉE DE SERVICE EN UTILISATION NORMALE.

TABLE DES MATIÈRES

 

Symboles

4 – 5

Autocollants – descriptions et emplacements

6

Mises en garde de sécurité - FAIRE, NE PAS FAIRE

18 - 19

Instructions

 

1.Caractéristiques………………………………………………………………………………………..10

2.Avantages………………………………………………………………………………………………10

3.Mise en place de la machine…………………………………………………………………………10 - 14

4.Procédures d’utilisation……………………………………………………………………………….14 - 15

5.Procedures d’alignement……………………………………………………………………………..15

6.Entretien………………………………………………………………………………………………..15

7.Guide de dépannage………………………………………………………………………………….16

8.Réparations…………………………………………………………………………………………….16

9.Pièces de rechange……………………………………………………………………………………16

10.Accessoires …………………………………………………………………………….…………….17

Diagrammes et pièces de rechange

22 – 24

Garantie ………………… ……………………………………………………………………………………...25

2

Image 2
Contents Operating Instructions and Parts List Model FTS-150 115V/60/1Contents Table DES MatièresContenido Hearing HazardSymbols Definitions Symboles Definición De Simbolos Prohibido Para Personas Ajenas a La Obra Page Page Safety First Safety First DO’S and do Nots Do notMachine Set-Up FeaturesBenefits Indication Mandatoryinformation InstructionAssembling the SAW Stand Figs a & B General Assembly InstructionsWater Tray Installation Cutting Head Installation FIG Fitting or Changing the Blade FIGElectrical Connections Water Pump InstallationWater Pump Safety Guidelines and Maintenance Position of Tile SAWCutting Table Operating ProceduresExtension Cords Quick Tips for Water Pump OperationCart Slot Location Adjustment See Diagram Alignment Procedures MaintenanceParallel Alignment See Diagram Check the Parallel AlignmentSpare Parts Trouble Shooting GuideRepairs Cart Extension P/N Accessory Use & InstallationAdjustable Protractor P/N Bullnose Mitering Guide P/NMises EN Garde FaireNE PAS Faire ¡SEGURIDAD Ante Todos HacerNo Hacer Diagram Diagram 1 FTS-150 Parts List Power Switch Housing AssyWiring Diagram Felker’s New Equipment Warranty Felker Canada Felker Corporate OfficeWestern Division Center